My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SJD_BRT_Mtg_3_Summary_Final_7-9-04
CWCB
>
SWSI
>
DayForward
>
SJD_BRT_Mtg_3_Summary_Final_7-9-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2009 1:15:34 PM
Creation date
1/4/2008 10:14:42 AM
Metadata
Fields
Template:
SWSI
Basin
Southwest
Title
Meeting Summary 3
Date
5/18/2004
SWSI - Doc Type
Summaries
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />San Juan/Dolores/San Miguel Basin Roundtable Technical Meeting #3 <br />Meeting Summary <br /> <br />. The Plateau Creek project is to increase flows below McPhee Reservoir for environmental <br />needs. <br />. WETP ACK Construction of Storage Upstream of McPhee Reservoir: McPhee is to replace <br />domestic depletions above a de minimus level. <br />. Janice Sheftel will provide a yield estimate for the Long Hollow project. <br />. La Plata Archuleta Water District: should go on identified projects and processes list. <br />. La Plata Archuleta Water District: storage should be shown as N/ A (not NP) <br />. Reconstruct Emerald Lake Dam: this has many "challenges," i.e., significant implementation <br />issues as it is in a wilderness area. <br />. Dutton Ditch and Pipeline: belongs on identified projects/processes list. <br />. Animas River instream flows: this is on CWCB's work list. <br />. La Plata River instream flows are controversial. This option could be collaborative with Long <br />Hollow project or the two may be mutually exclusive. It would take creative collaboration to <br />make the two work together. <br />. Mancos Water Conservancy District Inlet Canal: dependent on Federal legislation moving <br />forward; move it to identified projects/processes. <br />. Mancos Water Conservancy District Borrow Pit: would be about 300 AF of storage. <br />. The 12 miles of Dolores River below McPhee is a possible site for a Reservoir Reoperation <br />option. <br />. Blanco River: About 2 1/2 to 3 miles of restoration has been completed. <br />. Southern Ute Indian Tribe Options: projects would be multi-purpose. <br />. Straw Dam below Gurley Reservoir: this is part of the San Miguel Water <br />Management/ Conservation study that is forthcoming. <br />. Straw Dam and New Marie Scott Reservoir: John Porter has relevant info/reports. <br />. It was suggested that CWCB consider increase in Pre-construction Funding for Water <br />Projects: the concept is that a sponsor would only need to repay the funding if the project is <br />constructed. <br />. Revise Probable Maximum Precipitation (PMP) events: a high-altitude precipitation study is <br />still needed. We could possibly increase reservoirs' storage by about 1/3 if we could revise <br />the PMP approach. <br />. Consider impact of forested coverage in evaluating yields: the Water Resources Research <br />Institute has completed a relevant study. <br />. Add a forest management option to list of options for development of alternatives. We can <br />anticipate some benefits, as well as some downsides. The benefits may go beyond water <br />yield. <br />. Need a statewide or basinwide study of the effectiveness of changing PMP on a cursory level. <br />Steve Harris may have a relevant study from several years ago. <br />. WETP ACK San Juan County, Utah M&I Project: this is still being considered. Keep the option <br />on this list. <br />. Animas River stakeholders group work to reduce metals should be added to the Identified <br />Projects/Processes list. <br />. Basinwide stakeholders nutrient group is evaluating nutrient levels should be added to the <br />Identified Projects/Processes list. <br />. Tamarisk removal study is an ongoing evaluation. This multi-state effort should be added to <br />the Identified Projects/Processes list. <br /> <br />CDIVI <br /> <br />7 <br /> <br />SJD BRT Mtg #3 Summary_Final 7-9-04.doc 7/9/2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.