My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SJD_BRT_Mtg_2_Summary
CWCB
>
SWSI
>
DayForward
>
SJD_BRT_Mtg_2_Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2009 1:15:34 PM
Creation date
1/4/2008 10:10:07 AM
Metadata
Fields
Template:
SWSI
Basin
Southwest
Title
Meeting Summary 2
Date
2/10/2004
SWSI - Doc Type
Summaries
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Dolores/San Juan/San Miguel Basin Roundtable Technical Meeting #2 <br />Meeting Summary <br /> <br /> Technical <br />Meeting #2 <br />Attendance <br />- <br />Ed Zink Trail Alliance - La Plata County Recreational and Related Organizations X <br />Tom Knopick Duranglers Flyfishing Shop Recreational and Related Organizations X <br />Raymond Snyder San Miguel Water Conservancy District Water Conservancy and Conservation Districts <br />Steve Arveschoug Dolores Water Conservancy District Water Conservancy and Conservation Districts <br />Jim Formea Southern Ute Indian Tribe Indian Tribes X <br />Technical Advisors <br />Donald Schwindt Colorado Water Conservation Board Colorado Water Conservation Board X <br />John Porter Basin Advisor X <br />Sam Maynes Basin Advisor <br />Janice Sheftel Basin Advisor X <br />David Graf Division of Wildlife State Agencies X <br />Ken Beeg les Division Engineer State Agencies X <br />Rick Ryan Bureau of Land Management Federal Agencies X <br />Pat Page Bureau of Reclamation Federal Agencies X <br />Kelly Pal mer U.S. Forest Service Federal Agencies X <br /> <br />John Rehring reviewed the agenda for the meeting. The agenda included: <br /> <br />. A review of the SWSI process and status <br />. Revised water management objectives and subobjectives and the objective "weighting" <br />process <br />. Preliminary list of water management "options" and "tiering" <br />. Preliminary results of population estimates and water demands for the Dolores/San <br />J uan/ San Miguel basin <br />. Overview of draft water supply methodology <br />. Anticipated activities and input requested from BRT members between now and BRT3 <br />. Public comment <br /> <br />Copies of the presentation materials were distributed to BRT members. Comments and <br />questions received throughout the meeting were recorded on flip charts and are included in the <br />meeting notes below. The summary is not intended to be a verbatim account and answers to the <br />questions are not always summarized here. The purpose of the summary is to provide an <br />overview of the process and the general tenure of the meeting. <br /> <br />SWSI Process <br /> <br />Rick Brown reviewed the overall SWSI project schedule, progress to date, and described the <br />goals of this second BRT meeting. Rick noted that a few BRT members (in this basin and other <br />basins) had requested that they be able to see other BRT members' comments on materials such <br />as the objectives, demand methodology, etc. Rick acknowledged the value of this in a <br />transparent process and stated that he is investigating ways of making BRT members' <br />comments available electronically, possibly via the CWCB website. Larger reports referenced in <br />comments might not be reproduced or scanned. <br /> <br />CDIVI <br /> <br />2 <br /> <br />SJD BRT Mtg #2 Summary.doc 4/16/2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.