My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DSJSM_IDed_Proj&Proc_7.19.04
CWCB
>
SWSI
>
DayForward
>
DSJSM_IDed_Proj&Proc_7.19.04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2009 1:15:34 PM
Creation date
1/4/2008 9:03:12 AM
Metadata
Fields
Template:
SWSI
Basin
Southwest
Title
Identified Projects & Processes Catalog
Date
7/19/2004
SWSI - Doc Type
Identified Projects & Processes Catalog
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Dolores/San Juan/San Miguel Basin <br />Identified Projects and Processes Catalog <br /> <br />Endangered <br />Species Recovery Wildlife Service, <br />Program San Juan UMUT, SUIT, <br />River Basin BOR, <br />Recovery <br />Implmentation <br />Program <br />Native Fish <br />Stocking <br />La Plata Archuleta La Plata <br />Water District Archuleta Water <br /> District Task <br /> Force <br />Dutton Ditch and Pagosa Area Archuleta <br />Pipeline Water and <br /> Sanitation Di~ <br />Mancos Water Mancos Wate <br />Conservancy Conservancy <br />District District <br />Animas River <br />Stakeholders <br />Work Group to <br />reduce Metals <br />Basinwide <br />Stakeholders <br />Nutrient Group <br />Tamar <br />Study <br /> <br />Option Phasing <br /> <br />Include In <br /> <br />Notes <br /> <br />Cas <br /> <br />O&M Costs <br /> <br />Capital Cas <br /> <br />Supply Notes <br /> <br />Supply Yield <br />(acre-feet/yea <br /> <br />Storage/Flow <br />Rate Notes <br /> <br />Additional <br />Storage <br />(acre-feet) <br /> <br />Option Notes <br /> <br />Structural optionl Non-Structural <br />Type Option Type <br /> <br />of <br /> <br />Developmen <br />alluvial and <br />tributary <br />groundwate <br /> <br />Option <br />Beneficiary <br /> <br />Town of Rico <br />M&I users <br /> <br />County or use <br /> <br />Dolore <br /> <br />Sponsor <br /> <br />Town of Rico and <br />Dolores Water <br />Conservancy <br />District <br /> <br />Option Name <br /> <br />Rico Alluvial <br />Storage <br /> <br />Option <br />10 <br /> <br />D29 <br /> <br /> <br /> <br />D31 <br /> <br />existing proJe <br /> <br />$65,000,000 <br /> <br />2,000 <br /> <br />groundwate <br /> <br />River) , <br /> <br />(Hermosa Creek) <br />Project will <br />develop a potable <br />water system <br />including <br />treatment, <br /> <br />(Dolore <br /> <br />D38 <br /> <br />pipeline to replace <br />an open ditch <br />delivery system to <br /> <br />Alternatives being <br /> <br />Page 2 of2 <br /> <br />DRAFT <br /> <br />9.04; Identified ProJects and Processe <br /> <br />DSJSM option catalog_7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.