My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD11355
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD11355
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:21:01 AM
Creation date
1/3/2008 4:51:21 PM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Community
Jefferson County
Stream Name
Leyden Creek
Basin
South Platte
Title
LOMR - Affected Panel 183E, 184E - Case No. 05-08-0531P
Date
9/7/2006
Prepared For
Jefferson County
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CHANGES ARE MADE IN DETERMINATIONS OF BASE FLOOD ELEVATIONS FOR THE CITY <br />OF ARVADA AND THE UNINCORPORATED AREAS OF JEFFERSON COUNTY, COLORADO, <br />UNDER THE NATIONAL FLOOD INSURANCE PROGRAM <br /> <br />On June 17, 2003, the Department of Homeland Security's Federal Emergency Management Agency <br />identified Special Flood Hazard Areas (SFHAs) in the City of Arvada and in the unincorporated areas of <br />Jefferson County, Colorado, through issuance of a Flood Insurance Rate Map (FIRM). The Mitigation <br />Division has determined that modification of the elevations of the flood having a I-percent chance of <br />being equaled or exceeded in any given year (base flood) for certain locations in these communities is <br />appropriate. The modified Base Flood Elevations (BFEs) revise the FIRM for the communities. <br /> <br />The changes are being made pursuant to Section 206 of the Flood Disaster Protection Act of 1973 (Public <br />Law 93-234) and are in accordance with the National Flood Insurance Act of 1968, as amended <br />(Title XIII of the Housing and Urban Development Act of 1968, Public Law 90-448), 42 U.S.C. <br />4001-4128, and 44 CFR Part 65. <br /> <br />A hydraulic analysis was performed to incorporate a new hydrologic analysis and new topographic data <br />for Leyden Creek from the confluence with Ralston Creek to just upstream of Church Ditch and the <br />effects of two culverts located from approximately 900 feet upstream to approximately 1,300 feet <br />upstream of Indiana Street and from approximately 300 feet downstream to approximately 90 feet <br />downstream of Indiana Street, respectively. This has resulted in a revised delineation of the regulatory <br />floodway, increases and decreases in SFHA width, and increased and decreased BFEs for Leyden Creek. <br />In addition, a regulatory floodway was established for Leyden Creek from approximately 300 feet <br />upstream of Indiana Street to approximately 1,520 feet upstream of West 72nd Avenue. The table below <br />indicates existing and modified BFEs for selected locations along the affected lengths of the flooding <br />source(s) cited above. <br /> <br />Location <br /> <br />Existing BFE <br />(feet) * <br /> <br />Modified BFE <br />(feet) * <br /> <br />I Approximately 150 feet downstream of Simms Street <br />lApproximately 1,450 upstream of West 72nd Avenue <br />2Approximately 1,800 feet upstream of West 72nd Avenue <br />2 Approximately 100 feet downstream of Church Ditch <br /> <br />5,431 <br />5,452 <br />5,455 <br />5,616 <br /> <br />5,429 <br />5,447 <br />5,450 <br />5,605 <br /> <br />*National Geodetic Vertical Datum, rounded to nearest whole foot <br />lCity of Arvada <br />2Unincorporated areas of Jefferson County <br /> <br />Under the above-mentioned Acts of 1968 and 1973, the Mitigation Division must develop criteria for <br />floodplain management. To participate in the National Flood Insurance Program (NFIP), the community <br />must use the modified BFEs to administer the floodplain management measures of the NFIP. These <br />modified BFEs will also be used to calculate the appropriate flood insurance premium rates for new <br />buildings and their contents and for the second layer of insurance on existing buildings and contents. <br /> <br />Upon the second publication of notice of these changes in this newspaper, any person has 90 days in <br />which he or she can request, through the Chief Executive Officer of the community, that the Mitigation <br />Division reconsider the determination. Any request for reconsideration must be based on knowledge of <br />changed conditions or new scientific or technical data. All interested parties are on notice that until the <br />90-day period elapses, the Mitigation Division's determination to modify the BFEs may itself be changed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.