Laserfiche WebLink
<br />Agenda <br />Post-Vertical Team Meeting <br />Chatfield Reservoir Reallocation Study <br /> <br />Date: <br />Time: <br />Location: <br /> <br />January 19,2007 <br />lOam to Noon <br />CWCB Satellite Office: 1580 Logan St, 6th Floor Conference Room <br /> <br />Post-Meeting Analysis <br /> <br />1. Summarize Key Decisions per VTM <br />· Best possible schedule <br />· FR/EIS congressional approval already exists <br />· EIS Purpose fine as scoped <br />· EIS alternatives fine as scoped <br />· Cumulative Impacts per CEQ guidance and consistent with similar EIS' <br />· Options for contracting the storage space - to be investigated for best solution <br />· Space can be permanently "leased" to water users if CWCB contracts directly with Corps <br />· CWCB low interest loans available; loan workshop in Spring by Kirk Russell <br />· ER engine can keep turning to help determine FederalINon-federal interest in proceeding <br />· Others? <br /> <br />2. Summarize Action Items per VTM <br />· Document 7,700 and 20,600 AF storage levels for EIS <br />· Provide report to Corps regarding 7,000 AF firm yield <br />· Provide table/chart to Corps regarding reservoir hydrology (e.g. explain why the space <br />could be filled on average every 4+/- years) <br />· CWCB investigate the contracting possibilities for the "permanent right to use the <br />reallocated storage space" <br />· Develop broad brush estimates for ER decision making <br />· Look at timing for project funding (recreation mitigation, environmental mitigation, and <br />cost of storage) <br />· Investigate the advisability of pursuing Ag space for reducing cost of storage space <br />· Others? <br /> <br />3. Further Actions Needed <br /> <br />4. General Project Discussions and Wrap Up <br />