Laserfiche WebLink
<br />Questions for Vertical Team: <br />· Can the Project Delivery Team assume that use of existing guidance is adequate for the <br />analysis? <br /> <br />Statement B4: <br />· Based on the antecedent flood analysis, it is expected that the economic cost of foregoing up to 20,600 <br />acre-feet of flood storage will be very small, relatively. <br /> <br />Considerations: <br />· It should be fairly easy to demonstrate that to optimize reallocation from flood control to any other <br />purpose (e.g. water supply) will maximize the use of the reallocation. <br />· Once the optimization is demonstrated, the analysis of lesser levels of reallocation on an NED basis can <br />be briefly summarized in the report. <br />· Lesser levels of reallocated storage may need somewhat more discussion for NEPA purposes. <br /> <br />Question for Vertical Team: <br />· How do we identify what is needed to document the optimization issue, and how do we minimize <br />wasted effort in the EIS process? <br /> <br />3 <br />