My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD11224
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD11224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:12:17 AM
Creation date
12/28/2007 4:00:08 PM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Arapahoe
Basin
South Platte
Title
Chatfield Reallocation Study: Vertical Team Issues 01/18/2007
Date
1/18/2007
Prepared For
Meeting Participants
Prepared By
CWCB
Floodplain - Doc Type
Presentation/Handout/Sign-in Sheet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Questions for Vertical Team: <br />· Can the Project Delivery Team assume that use of existing guidance is adequate for the <br />analysis? <br /> <br />Statement B4: <br />· Based on the antecedent flood analysis, it is expected that the economic cost of foregoing up to 20,600 <br />acre-feet of flood storage will be very small, relatively. <br /> <br />Considerations: <br />· It should be fairly easy to demonstrate that to optimize reallocation from flood control to any other <br />purpose (e.g. water supply) will maximize the use of the reallocation. <br />· Once the optimization is demonstrated, the analysis of lesser levels of reallocation on an NED basis can <br />be briefly summarized in the report. <br />· Lesser levels of reallocated storage may need somewhat more discussion for NEPA purposes. <br /> <br />Question for Vertical Team: <br />· How do we identify what is needed to document the optimization issue, and how do we minimize <br />wasted effort in the EIS process? <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.