My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD11223
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD11223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:12:17 AM
Creation date
12/28/2007 3:59:05 PM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Arapahoe
Basin
South Platte
Title
Chatfield Reallocation Study: USACE Sample Agreement 06/17/2007
Date
6/17/2007
Prepared For
Meeting Participants
Prepared By
CWCB
Floodplain - Doc Type
Presentation/Handout/Sign-in Sheet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Heavener v020107 <br /> <br />contracting and financial transactions (Public Law 101-121, October 23, 1989) <br />and Federal Acquisition Regulation 52.203-12 issued pursuant thereto. <br /> <br />ARTICLE 14 - Definitions. <br /> <br />a. First cost of storage. This is the cost assigned to the Authority's <br />right to the storage space in the Project. This cost was developed under the <br />Use of Facilities method of cost allocation based on original Project costs <br />and is summarized in Exhibit B-II. <br /> <br />b. Interest on the unpaid balance. <br />this is the interest on the unpaid balance <br />made in lump sum, there is no amortization <br />on the unpaid balance. <br /> <br />When the Project cost is amortized, <br />(see Exhibit C). When payments are <br />schedule and therefore, no interest <br /> <br />c. Joint-use costs. <br />Project purposes. <br /> <br />The costs of features used for any two or more <br /> <br />d. Annual operation and maintenance (O&M) expense. Annual expenses <br />funded under the O&M, General account. These expenses include the daily <br />Project O&M costs as well as those O&M costs which are not capitalized. <br /> <br />e. Repair, rehabilitation and replacement (RR&R) costs. Costs funded <br />in part under the Operation and Maintenance, General, or Construction, General <br />accounts but not associated with first cost of storage. Such expenditures are <br />for costly, infrequent work and are intended to ensure continued satisfactory <br />operation of the Project. For the purposes of this agreement the term <br />"reconstruction" used in Article 7 shall be included in this definition of <br />repair, rehabilitation and replacement; repayment of those costs shall be the <br />same as described in Article 5b. <br /> <br />f. Fiscal Year. Refers to the Government's fiscal year. <br />begins on 1 October and ends on 30 September. <br /> <br />This year <br /> <br />g. <br /> <br />Life of the Project. <br /> <br />This is the physical life of the Project. <br /> <br />h. District Engineer. Refers to the District Engineer of the Tulsa <br />District of the United States Army Corps of Engineers, or his/her successor or <br />designee. <br /> <br />ARTICLE 15 - Termination of 1963 Agreement. Upon execution of this agreement <br />by the Secretary of the Army or his duly authorized representative, the 1963 <br />Agreement is terminated. <br /> <br />IN WITNESS WHEREOF, the parties have executed this agreement as of the <br />day and year first above written. <br /> <br />HEAVENER UTILITIES AUTHORITY <br /> <br />THE UNITED STATES OF AMERICA <br /> <br />By <br /> <br />By <br /> <br />MIKE KENNERSON <br />City Manager <br /> <br />MIROSLAV P. KURKA <br />Colonel, U.S. Army <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.