Laserfiche WebLink
<br />might be a lawyer to help us out, a third potential assistant here. I did a simple spreadsheet here, <br />because the environmental restoration won't continue through the 2008, don't know how the <br />instream parties will work with that. I did both with and without the instream group as sharing <br />these 2008 expenses. So in a way, wanting to do a budget here, its as high as this, or low, or <br />something like, put something in your budget as a placeholder, and maybe we can cover this <br />through this next year. <br /> <br />(?) Rick, do you have a justification for this... asterisk?.. <br /> <br />Rick: Not the asterisks showing where these numbers came out of. <br /> <br />Jeff Shoemaker - It was an 80/20 split between downstream and instream the first year, and this <br />current year was still an 80/20 split, but the 80 was split between upstream and downstream. <br />Correct, Rick, that the key factor has been at the end of the days that there is an environmental <br />gain. Questions is if there isn't a lot of ER work done in 08, but what has been done will be a <br />benefit, it is a good reason to contribute to next year. <br /> <br />Rick - I can't quantify those benefits, but there will be benefits, like more water for Littleton, <br />these are just ballpark possibilities. What this thing might look like.... <br /> <br />McAuliffe - Did Tom go through this with you? I will go through this. The way this will work, <br />we will have to get the authority, (draws on white board). Two major components, <br />environmental components and recreational components. We will know what we will have to <br />mitigate when the DEIS is out. When that happens, House Bill? By end of May 2008, this HB <br />will give the CWCB authority to do this project and everything entailed. Coinciding with this <br />HB, and the DEIS, we propose go out with two RFQs, and those are based on focusing the <br />consulting community... takes a huge amount of activity, focus them on result of consultant <br />selection by January 2009. At that point, would then award to the consultant selected the project <br />of design and implementation of the Plan. Both of these things will give us our dollar amounts. <br />Forecasting: $40 million each. That's the whole: design, implementation and construction, and <br />the cost of the consultants. Then manage the proj ect, between us and the Corps, so that based on <br />all of this, you have your water in Chatfield. (WI C). So the key is starting in this time period, <br />need the DEIS first, putting together the scope of what would be in those RFQs. In Recreational, <br />what would consultant have to bring? With Environment, same thing, scoping of these and the <br />implementation order to get qualified design and implementation, what we are talking about is <br />two $40 million project. Group wants these designed and implemented as soon as possible. <br /> <br />Lisa Darling: Coordination with consultants? <br /> <br />McAuliffe: These are your consultants, the people hired would be working with CWCB to be <br />scoping the RFQs , so couldn't make a bid. <br /> <br />Dave Giger: What if we submit an RFQ? <br /> <br />This document represents the personal staff notes of Susan Maul and are not to be considered a formal record of <br />this meeting. <br /> <br />3 <br />