My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD11190
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD11190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:12:16 AM
Creation date
12/28/2007 3:44:33 PM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Arapahoe
Basin
South Platte
Title
Chatfield Reallocation Study: Meeting Minutes 01/19/2007
Date
1/19/2007
Prepared For
Meeting Participants
Prepared By
CWCB
Floodplain - Doc Type
Meeting Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Meeting Summary <br />Post-Vertical Team Meeting <br />Chatfield Reservoir Reallocation Study <br /> <br />Date: January 19,2007 <br />Time: lOam to Noon <br /> <br />th <br />Location: CWCB Satellite Office: 1580 Logan St, 6 Floor Conference Room <br />Post-Meeting Analysis <br /> <br />Summarized Key Decisions per VTM <br />. Pursue best possible schedule <br />. FR/EIS congressional approval already exists <br />. The EIS purpose is sufficient as scoped <br />. EIS alternatives fine as scoped <br />. Cumulative Impacts per CEQ guidance and consistent with similar EIS' <br />. Options for contracting the storage space - to be investigated for best solution <br />. Space can be permanently "leased" to water users if CWCB contracts directly <br />with Corps <br />. CWCB low interest loans available; loan workshop in Spring by Kirk Russell <br />. ER engine can keep turning to help determine FederalINon-federal interest in <br />proceeding <br /> <br />Summarized Action Items per VTM <br />. Document 7,700 and 20,600 AF storage levels for EIS <br />. Provide report to Corps regarding 7,000 AF average yield <br />. Provide table/chart to Corps regarding reservoir hydrology (e.g. explain why <br />The space could be filled on average every 4+/- years) <br />. CWCB investigate the contracting possibilities for the "permanent right to use <br />the reallocated storage space" <br />. Develop broad brush estimates for ER decision making <br />. Look at timing for project funding (recreation mitigation, environmental <br />mitigation, and cost of storage) <br />. Investigate the advisability of pursuing Ag space for reducing cost of storage <br />space <br />
The URL can be used to link to this page
Your browser does not support the video tag.