My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Microsoft PowerPoint - GapTRT_410-26-06finalpresentation
CWCB
>
SWSI II Technical Roundtables
>
DayForward
>
Microsoft PowerPoint - GapTRT_410-26-06finalpresentation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2009 10:29:22 AM
Creation date
12/21/2007 10:32:03 AM
Metadata
Fields
Template:
SWSI II Technical Roundtables
Technical Roundtable
20% Gap
Title
SWSI - Addressing the Gap (Metting #4)
Date
10/27/2006
Author
CWCB
SWSI II - Doc Type
Presentations
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Ag Transfer Requirements for Meeting Gap <br /> <br />· Approximately 0.7 to 1.3 acres of irrigated land <br />must be dried up annually to provide for 1 AF of <br />M&I firm yield <br />- E.g. to meet a gap of 100,000 AFY of firm yield would <br />require an additional 70,000 to 130,000 acres/year of <br />dry-up, regardless of permanent or rotating transfer <br />- Additional storage is also required for capturing peak <br />diversions, delayed return flows and drought <br />carryover <br />· Storage needed is system specific, but could be <br />100,000 to 300,000 AF <br /> <br />37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.