Laserfiche WebLink
<br /> <br />Potential Future Gunnison Basin Water Mana ement Options <br /> <br />Aspinall Unit EIS Bureau of Reclamation Environmental Not Available Not Available Provide flows for endangered <br /> species flow recommendations <br /> and National Park Service <br /> reserved right. <br />Lake San Upper Gunnison River Additional Not Available 450 - M&I; Augmentation water for internal <br />Cristobal water Water Conservancy Storage 500 - Environ- calls on the Lake Fork; Requires <br />development District and Hinsdale mental CWCB to modify natural lake level <br /> County Commissioners decree. <br />Grand Mesa Grand Mesa Water Additional Not Available Not Available Restoring existing dams, building <br />Dams Conservancy District, Storage new dams and interconnecting <br />Rehabilitation Colorado River Water these with feeder canals for <br /> Conservation District and agricultural users. <br /> CWCB <br />Cactus Park Change Sponsor (per Additional Not Available Not Available This is an alternate to enlarging <br />Reservoir BRT3) Storage reservoirs on Grand Mesa; Would <br /> Grand Mesa Conservancy use existing decrees. <br />Paonia Reservoir North Fork Water Additional 2,000 1,000 Restore storage capacity due to <br />Dredging Conservancy District Storage siltation; Costs would include <br /> purchase of a used dredge and <br /> yearly dredging practices. <br />Electric Mountain North Fork Water Additional Not Available 1,000 This is an alternate to dredging <br />Reservoir Conservancy District Storage Paonia Reservoir. <br />Leroux Creek - Change Sponsor (per Additional Increase 450 Overland Dam and Canal owners <br />Overland BRT3) Storage Overland have 900 AF of conditional <br />Reservoir Storage by 8% decreed storage for Overland <br /> Reservoir; New storage down the <br /> canal or in Leroux Creek for <br /> agricultural users. <br /> <br />