Laserfiche WebLink
<br />Implementation Issues <br /> <br />Measure Implementation Issues Metro <br /> Mayors <br /> Caucus <br /> BMP <br />Metering of all utility The majority of Colorado water utilities are BMP2, <br />customers metered. This is a base assumption that all BMP7, <br /> utilities should meter. BMP11 <br />Submetering in Retrofit cost is dependent upon existing BMP5 <br />multi-family homes plumbing configuration. Billing should be <br /> conducted by utility and not property owner <br /> to ensure implementation. <br />Cooling Towers Increased cycles and resulting increase in BMP5 <br />increased cycle concentrations must be monitored carefully <br />concentration for potential impacts to equipment. <br />Residential Convincing utility management of the benefit BMP1 <br />Landscape Audits and to fund the program. Implementation of <br /> the audit findings by the property owner. <br /> <br />Utility Water Loss <br />Reduction Programs <br /> <br />None identified <br /> <br />BMP11 <br /> <br />16 <br />