Laserfiche WebLink
b. 10825 Study: A tour of Ruedi Reservoir took place immediately after the meeting.. <br />c. Energy use subcommittee: Greg Trainor reported that the City of Grand Junction is about to sign a <br />contract to serve as the fiscal agent for disbursing the energy consumptive use analysis grant <br />d. Vail ditch. Lurline Curran reported that the closing is scheduled for Febn~ary 1, and Grand County <br />is very pleased with the progress. <br />e. Roaring Fork Watershed. Mark Fuller reported that the Roaring Fork Watershed will make a <br />second grant request for Phase II to the CBRT at the November 2007 meeting. <br />f. Missouri Heights well monitoring study. Art Bowles reported that they are investigating the <br />purchase of well moiutoring equipment now, and that installation is scheduled for the Summer of <br />2008. <br />11. Proposed Fraser River siltation grant request. Kirk Klancke noted he plans to request money <br />to study removing silt from the Fraser River which has accumulated from winter road sanding <br />operations. <br />I:AInterbasin Compact Cominittee~Basin Roundtables\Colorado~Minutes~Ivlumtes Oct 2007 CBRT (2).doc ~ 12~- <br />