My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LeftHand_WCPlan_Applic
CWCB
>
Water Efficiency Grants
>
Day Forward
>
LeftHand_WCPlan_Applic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2012 4:08:44 PM
Creation date
12/13/2007 3:13:39 PM
Metadata
Fields
Template:
Water Efficiency Grants
Water Efficiency Grant Type
Water Conservation Planning Grant
Contract/PO #
OE PDA 08-69
Applicant
Left Hand Water District
Project Name
Left Hand Water District Water Conservation Plan
Title
Grant Application for Left Hand WD WCP
Date
9/10/2007
County
Eagle
Water Efficiency - Doc Type
Application
Document Relationships
LeftHand_WCPlan_PO
(Message)
Path:
\Water Efficiency Grants\Day Forward
LeftHandWCPlan2009
(Message)
Path:
\Water Conservation\DayForward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TASK A - DEVELOP WATER CONSERVATION PLAN <br /> <br />Purpose <br /> <br />Water conservation plans are required under the Water Conservation Act of 2004 for <br />covered entities that seek financial assistance from the ewes or the Colorado Water <br />Resources and Power Development Authority. The objective of this task is to develop a <br />Plan that meets the eWeB requirements, makes beneficial and responsible use of the <br />LHWD water supplies, and ultimately enables the District to apply for state financial <br />assistance for subsequent projects. <br /> <br />Approach <br /> <br />The Water Conservation Plan will be developed following CWCB1s Water Conservation <br />Plan Development Guidance Document. This document outlines the requirements <br />needed for ewes's approval. The Consultant will submit a draft plan to the LHWD for <br />comments prior to a public-review period. Following the public-review process, the <br />Consultant will incorporate public comments and submit the Plan to ewes for final <br />approval. <br /> <br />The development of the plan is divided into subtasks similar to what is indicated in the <br />ewes Model Plan Template. These subtasks list the items that need to be included in <br />the Water Conservation Plan for ewes approval. Where appropriate, the Consultant <br />will use previous studies. <br /> <br />Step 1 - Profile t.h,e .Existing Water System <br /> <br />Purpose <br /> <br />The activities described under this task will provide information on the District's existing <br />water supply system. <br /> <br />Approach <br /> <br />1.1 Profile physical characteristics of the existing water supply system: <br />CWS, 'with the help of District staff, will describe the physical <br />characteristics of the LHWD water system using Worksheet 1-1 as a <br />guide. Included in the summary will be key.system characteristics, <br />geographic area served, population and connections served, types of key <br />water users, key existing facilities, and water demand. <br /> <br />1 ~2 Identify all water sources: <br />CWS will identify and describe all of the system's water supply sources <br />including attributes, age, seniority, and conditions of its use. <br />Estimate,s/assumptions will be made on missing information~ <br /> <br />Clear Water Sol utjons" Inc. <br />Left Hand 'Vater '}istrict eWeB Grant Application <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.