My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD11052
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD11052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:19:35 AM
Creation date
12/3/2007 3:08:12 PM
Metadata
Fields
Template:
Floodplain Documents
County
Douglas
Community
Douglas County
Stream Name
Happy Canyon Creek, Grandview Tributary
Basin
South Platte
Title
LOMR - Affected Panel 65C, 70E - Case No. 01-08-358P
Date
4/24/2003
Prepared For
Douglas County
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CHANGES ARE MADE IN DETERMINATIONS OF BASE FLOOD ELEVATIONS FOR THE <br />UNlCORPORATED AREAS OF DOUGLAS COUNTY, COLORADO, UNDER THE NATIONAL <br />FLOOD INSURANCE PROGRAM <br /> <br />On January 5, 1996, the Federal Emergency Management Agency identified Special Flood Hazard Areas <br />(SFHAs) in the unincorporated areas of Douglas County, Colorado, through issuance of a Flood <br />Insurance Rate Map (FIRM). The Federal Insurance and Mitigation Administration has determined that <br />modification of the elevations of the flood having a I-percent chance of being equaled or exceeded in any <br />given year (base flood) for certain locations in this community is appropriate. The modified Base Flood <br />Elevations (BFEs) revise the FIRM for the community. <br /> <br />The changes are being made pursuant to Section 206 of the Flood Disaster Protection Act of 1973 (Public <br />Law 93-234) and are in accordance with the National Flood Insurance Act of 1968, as amended <br />(Title XIII of the Housing and Urban Development Act of 1968, Public Law 90-448), 42 U.S.C. <br />4001-4128, and 44 CFR Part 65. <br /> <br />A hydraulic analysis was performed to incorporate the effects of channel modifications associated with <br />the Com park development along Happy Canyon Creek from just downstream of the Arapahoe County <br />boundary to approximately 860 feet upstream of the confluence with Grandview Tributary. The <br />improvements included construction of a storm water detention facility and of a new bridge crossing at <br />Chambers Road, an existing bridge crossing at Highway E-470, and grading. This has resulted in a <br />revised delineation of the regulatory floodway, increases and decreases in SFHA width, and increased and <br />decreased BFEs for Happy Canyon Creek. The table below indicates existing and modified BFEs for <br />selected locations along the affected lengths of the flooding source(s) cited above. <br /> <br />Location <br /> <br />Existing BFE <br />(feet)* <br /> <br />Modified BFE <br />(feet) * <br /> <br />Approximately 1, 100 feet upstream of <br />Arapahoe County boundary <br />Approximately 600 feet downstream of <br />confluence with Grandview Tributary <br /> <br />5,733 <br /> <br />5,732 <br />5,764 <br /> <br />5,763 <br /> <br />*National Geodetic Vertical Datum, rounded to nearest whole foot <br /> <br />Under the above-mentioned Acts of 1968 and 1973, the Federal Insurance and Mitigation Administration <br />must develop criteria for floodplain management. To participate in the National Flood Insurance Program <br />(NFIP), the community must use the modified BFEs to administer the floodplain management measures <br />of the NFIP. These modified BFEs will also be used to calculate the appropriate flood insurance premium <br />rates for new buildings and their contents and for the second layer of insurance on existing buildings and <br />contents. <br /> <br />Upon the second publication of notice of these changes in this newspaper, any person has 90 days in <br />which he or she can request, through the Chief Executive Officer of the community, that the Federal <br />Insurance and Mitigation Administration reconsider the determination. Any request for reconsideration <br />must be based on knowledge of changed conditions or new scientific or technical data. All interested <br />parties are on notice that until the 90-day period elapses, the Federal Insurance and Mitigation <br />Administration's determination to modify the BFEs may itself be changed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.