My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD11052
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD11052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:19:35 AM
Creation date
12/3/2007 3:08:12 PM
Metadata
Fields
Template:
Floodplain Documents
County
Douglas
Community
Douglas County
Stream Name
Happy Canyon Creek, Grandview Tributary
Basin
South Platte
Title
LOMR - Affected Panel 65C, 70E - Case No. 01-08-358P
Date
4/24/2003
Prepared For
Douglas County
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2 <br /> <br />The following table is a partial listing of existing and modified BFEs: <br /> <br />Location <br /> <br />Existing BFE <br />(feet)* <br /> <br />Modified BFE <br />(feet) * <br /> <br />Approximately 1,100 feet upstream of <br />Arapahoe County boundary <br />Approximately 600 feet downstream of <br />confluence with Grandview Tributary <br /> <br />5,733 <br /> <br />5,732 <br /> <br />5,763 <br /> <br />5,764 <br /> <br />*Referenced to the National Geodetic Vertical Datum, rounded to the nearest whole foot <br /> <br />Public notification of the proposed modified BFEs will be given in the Denver Post on or about <br />January 16 and January 23,2003. A copy of this notification is enclosed. In addition, a notice of <br />changes will be published in the Federal Register. Within 90 days ofthe second publication in the <br />Denver Post, any interested party may request that FEMA reconsider the determination made by this <br />LOMR. Any request for reconsideration must be based on scientific or technical data. All interested <br />parties are on notice that, until the 90-day period elapses, the determination to modify the BFEs made by <br />this LOMR may itself be modified. <br /> <br />Because this LOMR will not be printed and distributed to primary users, such as local insurance agents <br />and mortgage lenders, your community will serve as a repository for these new data. We encourage you <br />to disseminate the information reflected by this LOMR throughout the community, so that interested <br />persons, such as property owners, local insurance agents, and mortgage lenders, may benefit from the <br />information. We also encourage you to prepare a related article for publication in your community's <br />local newspaper. This article should describe the assistance that officials of your community will give to <br />interested persons by providing these data and interpreting the NFIP maps. <br /> <br />We will not physically revise and republish the FIRM and FIS report for your community to reflect the <br />modifications made by this LOMR at this time. When changes to the previously cited FIRM panels and <br />FIS report warrant physical revision and republication in the future, we will incorporate the <br />modifications made by this LOMR at that time. <br /> <br />The floodway is provided to your community as a tool to regulate floodplain development. Therefore, <br />the floodway modifications described in this LOMR, while acceptable to FEMA, must also be acceptable <br />to your community and adopted by appropriate community action, as specified in Paragraph 60.3(d) of <br />the NFIP regulations. <br /> <br />This LOMR is based on minimum floodplain management criteria established under the NFIP. Your <br />community is responsible for approving all floodplain development and for ensuring all necessary <br />permits required by Federal or State law have been received. State, county, and community officials, <br />based on knowledge of local conditions and in the interest of safety, may set higher standards for <br />construction in the SFHA. If the State, county, or community has adopted more restrictive or <br />comprehensive floodplain management criteria, these criteria take precedence over the minimum NFIP <br />criteria. <br /> <br />The basis of this LOMR is, in whole or in part, a channel-modification/culvert project. NFIP regulations, <br />as cited in Paragraph 60.3(b )(7), require that communities ensure that the flood-carrying capacity within <br />the altered or relocated portion of any watercourse is maintained. This provision is incorporated into <br />your community's existing floodplain management regulations. Consequently, the ultimate <br />responsibility for maintenance of the modified channel and culverts rest with your community. <br />
The URL can be used to link to this page
Your browser does not support the video tag.