My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
16a (4)
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
16a (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:35:56 PM
Creation date
11/30/2007 12:05:33 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/18/2007
Description
CF Section - En-bloc Non-Reimbursable Investments - Division of Water Resources - Satellite Monitoring System Maintenance
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_ _ <br />.. <br />Discussion <br />Following are the key elements of the DWR Satellite-linked monitoring system and Flood <br />Hardening Program: <br />• Continue the long term operational viability of over 450 satellite-linked water monitoring <br />sites by: <br />o Replacement of out-dated data collection platforms and upgrading of satellite <br />transmission components. <br />o Refurbishment of existing stream gages as needed to maintain the operation <br />reliability of stream flow data. <br />• Flood hardening of key stations against flood events in order to continue collection of <br />critical real-time stream flow data in times of flooding. <br />Recommendation <br />Staff recommends $300,000 from the Construction fund to be appropriated to the <br />Department of Natural Resources for allocation to the Division of Water Resources (DWR) to <br />enhance, renovate, and replace the Data Collection Platforms in the existing satellite monitoring <br />system (The details of the DWR Satellite Monitoring System funding request are explained in <br />the attached memo from Jack Byers to Dan McAuliffe dated September 5, 2007.) Furthermore, <br />staffrecommends that another $50,000 be requested for the stream gage flood hardening <br />program which is administered and coordinated between both the DWR and CWCB. The flood <br />hardening funds will also be allocated to DWR. The total cost for these programs is $350,000. <br />Attachments <br />• <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.