My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
15 (2)
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
15 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:35:35 PM
Creation date
11/30/2007 11:49:18 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/18/2007
Description
CF Section - Changes to Existing Non-Reimbursable Projects - City of Florence - Oak Creek Reservoir Feasibility Study
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
During the initial geotechnical investigation of the reservoir site, it was determined that the <br />construction of a dam for flood control and/or water supply storage purposes was no longer a <br />feasible option. The COE and the City are planning to continue with the original study's scope of <br />work by evaluating all the feasible alternatives to reduce flooding impacts to the City. <br />The following is a breakdown of the funding to date for the Project: <br />Entity Budget Current <br />Expenditures <br />Co of En ineers $448,000 $151,783 <br />Town of Florence $281,000 $91,070 <br />CWCB $167,000 $60,713 <br />Total $896,000 $303,566 <br />Discussion <br />The City of Florence has been considered by many to be one of Colorado's larger flood threats <br />despite its small geographic size and population. The City currently ranks 21St in the State of <br />Colorado (out of 235 communities eligible to purchase flood insurance) in number of active flood <br />insurance policies through the National Flood Insurance Program. Even more relevant is the fact <br />that only one of the Top 20 communities above Florence (the Town of Telluride) has a smaller <br />population. In fact, with one policy per 20 residents, the City of Florence has the second highest <br />ratio in the state for medium or large communities. While this is only an indirect measurement of <br />actual flood risk, past experience has shown that the number of insurance policies held often <br />correlates very well to actual or perceived flood risk. <br />Because the scope of the COE's project has not changed from the initial flood control feasibility <br />study, this change only removes the water storage component but does not represent a change in the <br />study's intent. The flood control aspect of this study is well within the mission of the Colorado <br />Water Conservation Board. Because it is one of the more floodprone communities in the entire state, <br />any activity taken to reduce flood potential in this community will serve the goal of mitigating flood <br />risk to the State. <br />Staff Recommendation <br />Staff recommends that the Board approve the use of a previously approved Non-Reimbursable <br />Project Investment to the City of Florence for a Feasibility Study for the purposes of flood control <br />mitigation to be performed by the U.S. Corps of Engineers. The staff also recommends transferring <br />the appropriated funds remaining under Non-Reimbursable Contract number C150203 to a new <br />contract for the same. <br />The project title and description as shown in the original Non-Reimbursable Project investment, <br />SBOS-084, must be revised in the 2008 Projects Bill before a contract can be executed. <br />Staff recommends the use of the following language to be used in the Projects Bill. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.