My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11 (2)
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
11 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:34:15 PM
Creation date
11/30/2007 11:41:22 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/18/2007
Description
ISF Section - Contested Instream flow Appropriation Hearing - Badger Creek
Board Meetings - Doc Type
Memo
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Stream: Badger- Creek <br />Executive Summary <br />Water Di~~ision: 2 <br />Water District: 12 <br />CDOW#: 29098 <br />CWCB ID: 07/2/A-002 <br />Segment: Springs near Antelope Gulch to Confluence with Arkansas River <br />Upper Terminus: Springs near Antelope Gulch <br />(Latitude 38° 39' 13.9"N) (Longitude 105° 48' 52.5"W) <br />Lower Terminus: Confluence with Arkansas River <br />(Latitude 38° 27' 54.6"N) (Longitude 105° 51' 40.9"W) <br />Watershed: Arkansas Headwaters (HUC#:11020001) <br />Counties: Fremont <br />Length: 16.0 miles <br />USGS Quad(s): Gribbles Park, Jack Hall Mountain, Howard <br />Existing Instream Flow: 3.0 cfs (Year-round) <br />Flow Recommendation (Enlargement): 2.5 cfs (April 1 to August 31) <br />2.0 cfs (September 1 to October 31) <br /> <br />::. . <br />_,, <br />
The URL can be used to link to this page
Your browser does not support the video tag.