My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11 (2)
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
11 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:34:15 PM
Creation date
11/30/2007 11:41:22 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/18/2007
Description
ISF Section - Contested Instream flow Appropriation Hearing - Badger Creek
Board Meetings - Doc Type
Memo
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
titream: l;~lci+~cr (•1-c~~l. <br />Executive Summary <br />Water Divisie~n: 2 <br />Water District: 12 <br />CDOW#: 29098 <br />C'W'C'B 1 D: 07/2'A-002 <br />Segment: Springs near :antelope Gulch to Confluence with Arkansas River <br />tipper Terminus: Sprints near Antelope Gulch <br />(Latitude 3R° 39' 13.9"N) (Longitude 105° 48' 52.5"W) <br />Lo~~~er Terminus: C'onfluencc with Arkansas River <br />(Latitude 38° 27' 53.6"N) (Lontitude 105° 51' 4O.9"W) <br />V~'atershed: Arkansas Headwaters (HUC#:11020001) <br />Counties: Fremont <br />Length: 16.(1 miles <br />i~SGS Quad(s): Gribbles Park, Jack Hall Mountain, Howard <br />f•:sistin~ lnstream Flow: 3.0 cfs (Year-round) <br />F lii~~ Ilcr~rnrnr~•ncl;rtir~n I I nl:rr~~cnn~rrt i '.5 cfs (April 1 to Autust 31) <br />.'..0 cfs (September 1 to October 31) <br />~.Y <br />.c _ <br />r -" <br />~ ~~~_. <br />~~~~ <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.