Laserfiche WebLink
Water Supply Reserve Account – Grant Application Form <br />Form Revised May 2007 <br />_______________________________________ <br /> <br />objectives to be addressed by each plan component. The plan will be written in collaboration with selected <br />stakeholders to ensure it correctly addresses key water resource topics and issues. The plan will be provided <br />electronically and in hard-copy to facilitate future updates as new information becomes available. <br /> <br />Task 4Public Outreach: $1,500 <br /> <br />To inform the public of the results, future monitoring plans, and obtain additional feedback. <br />A series of public meetings will be held in conjunction with the U.S.G.S team to solicit comments from interested <br />parties regarding specific parameters and areas of interest. A more complete description can be found in the <br />USGS proposal enclosed with this application which may be modified to include comments and <br />recommendations of the Roundtable. <br /> <br />? <br /> Description of task: This task is actually, in part, a component of all preceding tasks, in addition to being the <br />final tasks wherein all project results and products will be shared and demonstrated for the public and <br />interested stakeholders and project participants. Throughout the project, numerous meetings will be <br />conducted in order to provide and to obtain input. At the completion of the project 1-2 public outreach <br />meetings will be planned and conducted to demonstrate how to access and use the website product as well as <br />to summarize key findings that are documented in the final project report. <br /> <br />? <br /> Method: Plan and conduct meetings with stakeholders, project participants, and the general public. <br />PowerPoint presentations and live demonstrations of to develop and complete user-customized data query <br />and retrievals form the web-accessible database. USGS staff will conduct outreach in collaboration with <br />Mike Zopf (Routt County) and representatives from the City of Steamboat Springs. Note: the attached <br />project budget only includes the final project outreach activities, but significant additional outreach tasks <br />have been planned and budgeted for within the other project tasks as well. <br /> <br />? <br /> Deliverable: Outreach meetings at the completion of the project are the budgeted deliverable for this task. <br />During the early and mid-stages of the project, deliverables will include prioritized listings of available data <br />sets and water–resource issues that should be incorporated into the project scope and approach. <br /> <br />II.Personnel <br /> <br />Project Director: Kirby Wynn, Supervisory Hydrologist, U.S. Geological Survey: <br />Qualifications: Since 1997 Mr. Wynn has personally completed and also supervised completion of essentially <br />the same size, scope, and approach for projects with nearly identical objectives for the Gore Creek, Blue River, <br />Eagle River, Roaring Fork River, and San Juan, Animas, Dolores/San Miguel watersheds. These previous and <br />ongoing projects have been completed while achieving the full proposed scope of work on time and within <br />budget. Since 2001, Mr. Wynn has supervised and provides technical and budget oversight to hydrologists, <br />students, and contractors who are engaged in water resource projects with cumulative budgets exceeding <br />$1,500,000 annually. <br /> <br />Project Database and Web Development Lead: David Litke, Database and GIS Specialist, U.S. Geological <br />Survey: <br />Qualifications: Mr. Litke has personally designed and compiled as well as supervised the compilation of large <br />scale (larger and more complex than the currently proposed database) water-resource databases since 1994. Mr. <br />Litke is regularly tasked by the USGS to travel to foreign countries for detail assignments to design, teach, <br />mentor, and complete large scale database construction and maintenance tasks. Mr. Litke has completed and <br />supervised completion of website interfaces identical to the interface proposed for this project. <br /> <br /> <br /> <br />10 <br /> <br />