Laserfiche WebLink
SECTIONTWO <br />Program Plan <br />2.1 PROGRAM PLAN - OBJECTIVES <br />The State of Colorado's Business Case Plan supports the following objectives. <br />Perform a 2-phased statewide needs assessment on a yearly basis in order to determine <br />the upcoming year's restudy and map update priorities. The first phase of this needs <br />assessment process will be quantitative and will identify the top 25 percent of counties <br />eligible for funding. (For FY '08 the top 50% of counties will be identified.) The second <br />phase will be a qualitative analysis of only those counties within the top 25 percent (the <br />top 50% for FY '08). <br />Conduct community outreach activities, with the culmination being Initial Coordination <br />Meetings. Counties being considered for possible floodplain studies and map updates, <br />including municipalities in those counties, will be visited for two purposes. The first <br />purpose will be to provide them with information about the work involved in preparing <br />floodplain studies in their communities. The second purpose will be to determine <br />preliminarily the local mapping needs, the available resources for map updates, and the <br />general readiness of local officials to play their part in the preparation of a countywide <br />DFIRM study. <br />• Perform Scoping Meetings in coordination with FEMA, the engineering consultants, and <br />impacted communities within each county that is to be studied. This process will <br />conclude with the completion of a Scope of Work for each county that is being mapped. <br />Work with the engineering consultants and local officials to produce maps that meet <br />FEMA's technical and graphical requirements within the agreed upon timeframe, while <br />simultaneously utilizing local resources and meeting local needs. <br />• Establish and manage an Internet-enabled distribution system that will allow users to both <br />view and access the digital data used to produce the Digital FIRM. Ultimately this <br />system should support the submittal of new data to be reviewed and considered for future <br />map upates and revisions, including the processing of LOMRs. <br />In addition to the yearly production goals mentioned above, the CWCB seeks to achieve the <br />following goals as Map Modernization progresses. <br />• Assume responsibility for long-term, periodic maintenance of Colorado DFIRMs. <br />• Continue and enhance outreach to the public and communities (counties and <br />municipalities). <br />• Update the Business Case Plan on a yearly basis. <br />• Produce data in a consistent statewide format (NAVD 88, NAD 83, UTM) that can be <br />used to produce a statewide base map and scoping tool to facilitate flood hazard mapping <br />in the future. <br />• Produce and publish multi-hazard data (primarily flood hazards and debris flows) in <br />support of FEMA's multi-hazard objective. This includes the creation and maintenance <br />of a statewide GIS environment that will support and encourage mapping of other hazard <br />data such as erosion risk, stream instability and channel migration, landslides, avalanche <br />Colorado Business Case Plan (Final Draft) 2-1 <br />