My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
South Platte - Stage Discharge Data Logger & Telemetry Installation Project_Application
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
South Platte - Stage Discharge Data Logger & Telemetry Installation Project_Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2012 3:22:43 PM
Creation date
11/29/2007 1:20:29 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
South Platte
Applicant
Northern Colorado Water Conservancy District
Description
Stage Discharge Data Logger and Telemetry Installation Project
Account Source
Basin
Board Meeting Date
1/23/2008
Contract/PO #
08000000120
WSRA - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Supply Reserve Account – Grant Application Form <br />Form Revised May 2007 <br />_______________________________________ <br /> <br />5. Please summarize the proposed scope of work. Please refer to Part 2 of the Criteria and Guidance document for <br />detailed requirements. On the following page there is an example format for the Scope of Work. You can use <br />the example format or your own format, provided that comparable information is included. <br /> <br />The scope of work should outline by task how the water activity will be accomplished. It is important that the <br />scope of work detail the specific steps, activities/procedures that will be followed to accomplish the water activity <br />and the specific products/deliverables that will be accomplished. The scope of work should include but not be <br />limited to: task description, key personnel, budget, schedule and deliverables and the <br />final <br />report/project documentation upon completion of the water activity. <br /> <br />I. Specific Project Tasks <br /> <br />Task 1 <br /> <br />Make final identification of the sites to install data loggers and cell <br />phone modems. Presently, the following sites have been selected for <br />installation of the equipment based on identification by Water <br />Commissioners. <br /> <br />District 1: <br /> <br />? <br /> <br />Bijou Reservoir Inlet at the Reservoir (cell phone modem <br />telemetry only) <br /> <br />District 2: <br /> <br />? <br /> <br />Lower Latham augmentation site (cell phone modem telemetry only) <br />? <br /> <br />Lower Latham Ditch Diversion (cell phone modem telemetry only) <br />? <br /> <br />Platteville Ditch (data logger and cell phone modem telemetry) <br />? <br /> <br />Meadow Island No. 1 (data logger and cell phone modem telemetry) <br />? <br /> <br />Meadow Island Aug. Station (data logger and cell phone modem <br />telemetry) <br />? <br /> <br />Farmers Independent (data logger and cell phone modem telemetry) <br />? <br /> <br />Section 3 Ditch (data logger and cell phone modem telemetry) <br />? <br /> <br />Union (data logger and cell phone modem telemetry) <br /> <br />District 64: <br /> <br />? <br /> <br />Julesburg Reservoir Inlet (cell phone modem telemetry only) <br />? <br /> <br />North Sterling Reservoir Inlet (data logger and cell phone modem <br />telemetry) <br /> <br />District 3 <br />? <br /> <br />Whitney Ditch (data logger and cell phone modem telemetry) <br />? <br /> <br />Greeley No. 3 (data logger on inlet and cell phone modem telemetry <br />on augmentation station) <br /> <br /> <br /> <br />9 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.