My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
South Platte - Stage Discharge Data Logger & Telemetry Installation Project_Application
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
South Platte - Stage Discharge Data Logger & Telemetry Installation Project_Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2012 3:22:43 PM
Creation date
11/29/2007 1:20:29 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
South Platte
Applicant
Northern Colorado Water Conservancy District
Description
Stage Discharge Data Logger and Telemetry Installation Project
Account Source
Basin
Board Meeting Date
1/23/2008
Contract/PO #
08000000120
WSRA - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Supply Reserve Account – Grant Application Form <br />Form Revised May 2007 <br />_______________________________________ <br /> <br />Task 5 <br /> <br />Report detailing equipment installed. <br /> <br /> <br /> <br />II. Personnel <br /> <br />All of the equipment will be installed directly or under the direction <br />of DWR, LSPWCD and/or Northern Water staff. Staff has extensive <br />experience concerning the installation of the data loggers and cell <br />phones modems described in this application. In addition, staff has <br />succeeded in necessary programming to transmit the collected data from <br />these sites and displaying this information on the Internet. <br /> <br />III Budget <br /> <br />Equipment is the only cost associated with this grant application. All <br />other costs will be absorbed by the co-applicants. <br /> <br /> <br />Item Unit Cost Units Total Cost <br /> <br /> <br />Data Loggers 1400 16 $22400 <br />Cell Phone Modem Telemetry 1200 22 $26400 <br /> <br /> <br /> <br />Total Cost $48800 <br /> <br /> <br /> <br />This cost does not include shelters and stilling wells which should be <br />already at each site. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />IV.Schedule <br /> <br />Task 1: Final Site Selection: 1-31-2008 <br />Task 2: Equipment Purchase: 3-31-2008 <br />Task 3: Completion of Installation of Equipment: 9-30-2008 <br />Task 4 and 5: Data Transmittal and Display Completion – 12-31-2008 <br /> <br />Suggested Format for Scope of Work <br /> <br /> <br /> <br />11 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.