My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10993
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD10993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:13:51 AM
Creation date
11/19/2007 1:54:05 PM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Community
Littleton
Stream Name
Big Dry Creek
Basin
South Platte
Title
LOMR - Affected Panel 10D - Case No. 06-08-B392P
Date
7/13/2007
Prepared For
Littleton
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CHANGES ARE MADE IN DETERMINATIONS OF BASE FLOOD ELEVATIONS FOR THE <br />CITIES OF ENGLEWOOD AND LITTLETON, COLORADO, UNDER THE NATIONAL FLOOD <br />INSURANCE PROGRAM <br /> <br />On August 16, 1995, and September 29, 1989, respectively, the Department of Homeland Security's <br />Federal Emergency Management Agency identified Special Flood Hazard Areas (SFHAs) in the City of <br />Englewood and the City of Littleton, Colorado, through issuance of Flood Insurance Rate Maps (FIRMs). <br />The Mitigation Division has determined that modification of the elevations of the flood having a <br />I-percent chance of being equaled or exceeded in any given year (base flood) for certain locations in <br />these communities is appropriate. The modified Base Flood Elevations (BFEs) revise the FIRMs for the <br />communities. <br /> <br />The changes are being made pursuant to Section 206 of the Flood Disaster Protection Act of 1973 (Public <br />Law 93-234) and are in accordance with the National Flood Insurance Act of 1968, as amended <br />(Title XIII of the Housing and Urban Development Act of 1968, Public Law 90-448), 42 U.s.C. <br />4001-4128, and 44 CFR Part 65. <br /> <br />A hydraulic analysis was performed to incorporate the effects of channel improvements, construction of <br />the Regional Transportation District Light Rail Bridge, replacement of the Windermere Street bridge, and <br />construction of a floodwall along Big Dry Creek from the confluence with the South Platte River to <br />approximately 170 feet downstream of West Belleview Avenue. This has resulted in a revised delineation <br />of the regulatory floodway, increases and decreases in SFHA width, and increased and decreased BFEs <br />for Big Dry Creek. The table below indicates existing and modified BFEs for selected locations along the <br />affected lengths of the flooding source(s) cited above. <br /> <br />Location <br /> <br />Existing BFE <br />(feet)* <br /> <br />Modified BFE <br />(feet) * <br /> <br />2 Just downstream of South Santa Fe Drive <br />2Just upstream of Denver and Rio Grande Western Railroad <br />I Approximately 310 feet upstream of South Windermere Street <br />I Approximately 460 feet upstream of South Windermere Street <br /> <br />5,318 <br />5,328 <br />5,331 <br />5,333 <br /> <br />5,317 <br />5,326 <br />5,330 <br />5,334 <br /> <br />*National Geodetic Vertical Datum, rounded to nearest whole foot <br />ICity of Englewood <br />2City of Littleton <br /> <br />Under the above-mentioned Acts of 1968 and 1973, the Mitigation Division must develop criteria for <br />floodplain management. To participate in the National Flood Insurance Program (NFIP), the community <br />must use the modified BFEs to administer the floodplain management measures of the NFIP. These <br />modified BFEs will also be used to calculate the appropriate flood insurance premium rates for new <br />buildings and their contents and for the second layer of insurance on existing buildings and contents. <br /> <br />Upon the second publication of notice of these changes in this newspaper, any person has 90 days in <br />which he or she can request, through the Chief Executive Officer of the community, that the Mitigation <br />Division reconsider the determination. Any request for reconsideration must be based on knowledge of <br />changed conditions or new scientific or technical data. All interested parties are on notice that until the <br />90-day period elapses, the Mitigation Division's determination to modify the BFEs may itself be changed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.