Laserfiche WebLink
<br />3 <br /> <br />and do not supersede any State or local requirements of a more stringent nature. This includes adoption <br />of the effective FIRM to which the regulations apply and the modifications described in this LOMR. <br />Our records show that your community has met this requirement. <br /> <br />A Consultation Coordination Officer (CCO) has been designated to assist your community. The CCO <br />will be the primary liaison between your community and FEMA. For information regarding your CCO, <br />please contact: <br /> <br />Mr. Steve L. Olsen <br />Director, Mitigation Division <br />Federal Emergency Management Agency, Region VIII <br />Denver Federal Center, Building 710, Box 25267 <br />Denver, CO 80225-0267 <br />(303) 235-4830 <br /> <br />If you have any questions regarding floodplain management regulations for your community or the NFIP <br />in general. please call the CCO for your community at the telephone number cited above. If you have <br />any questions regarding this LOMR, please ca)) our Map Assistance Center, to)) free, at <br />1-877-FEMA MAP (1-877-336-2627). <br /> <br />Sincerely, <br /> <br />Jla1? ? .A{ a-p--- <br /> <br />Sa))y P. Magee, Project Engineer <br />Hazards Study Branch <br />Federal Insurance and <br />Mitigation Administration <br /> <br />For: Matthew B. Miller, P.E.. Chief <br />Hazards Study Branch <br />Federal Insurance and <br />Mitigation Administration <br /> <br />Enclosures <br /> <br />cc: Mr. Timothy Gelston <br />Community Development Coordinator <br />City of Cherry Hills Village <br /> <br />Mr. Bill DeGroot, P.E. <br />Chief, Floodplain Management Program <br />Urban Drainage and Flood Control District <br /> <br />, P.E. <br />William P. Ruzzo, P.E., LLC <br />