Laserfiche WebLink
5 '~''x- -.•~•ye <br />~~ ~~ ~ ~; <br />~n. ~~ <br />~ ~ <br />~ ~ .;;~ _ <br />~. _ <br />~. <br />r'1 L <br />Y } <br />+ `; <br />i ~ ~ i+ i <br />d.:[pL~~1t,'t1~.~ <br />~~ <br />~~~~~~~.!y9l~1~: ~.~: `. I ~~ <br />I •~', l~f~A~~d._• <br />1~:~4~[_11~:L:L:S <br />Approved Water Supply Reserve Account Applications by the CWCB Board <br /> <br />Gunnison Basin Total Request $338,700 $840,700 $1,659,400 <br />Off-System Raw Water Storage Project 7 Water AuthoritylUncompahgre Ualley <br />Water Users Association $56,700 <br />Paonia-Feldman Diversion Reconstruction; North Fork of the Gunnison River <br />(Part 1) $48,000 <br />Paonia-Feldman Diversion Reconstruction; North Fork of the Gunnison River <br />(Part 2) $62,700 <br />Sedimentation Management Study for Paonia Reservoir - North Fork of the <br />Gunnison $79,000 $230,000 <br />Overland Reservoir Dam ExpansionlRestoration $68,000 <br />Lake San Cristobal Controlled Outlet Structure $35,000 <br />Safety and Serviceability Needs Inventory for Reservoirs in the Lerou Creek <br />Drainage Basin $60,000 <br />Orchard City Water Reservoir Project $60,000 $480,000 <br />Metro Basin Total Request $453,000 $200,000 $653,000 <br />Parker Water and Sanitation and Colorado State University Joint Project on the <br />RurallUrban Farm Model $150,000 <br />Zero Liquid Discharge Pilot Study $200,000 $200,000 <br />Chatfield Reallocation EISIFR $103,000 <br />North Platte Basin - None Requested <br />Rio Grande Basin Total Request $184,950 $392,000 $576,950 <br />Alamosa River Watershed Restoration Project $104,000 <br />Romero-Guadalupe Channel Rectification Project $83,700 <br />Alamosa River Instream Flow Project $864,500 <br />Preliminary Design Multi-use Rio Grande Reservoir Rehabilitation and <br />Enlargement $288,000 <br />Rio Grande Conservation Reserve Enhancement Project $36,750 <br />South Platte Basin Total Request $255,000 $278,476 $533,476 <br />Lower South Platte Wetland Initiative Phase 1 South Platte River, CO $278,476 <br />Ovid Reservoir Feasibility Study $176,000 <br />Chatfield Reallocation EISIFR $27,000 <br />Clear Creek Water BanklHigh Altitude Storage $52,000 <br />Southwest Basin Total Request $107,700 $1,260,000 $1,361,700 <br />Goodman Point Phase 2 $20,000 $240,000 <br />Jackson Gulch $20,000 <br />Dry Gulch ReservoirlSan Juan Reservoir Land Acquisition $1,000,000 <br />Goodman Point Water Association Pipeline Environmental Assessment $7,700 <br />Jackson Gulch Reservoir Expansion $80,000 <br />YampalWhitelGreen Basin Total Request $49,500 $150,000 $199,500 <br />Energy Development Water Needs Assessment $150,000 $300,000 Joint App, <br />(See Colorado) <br />Morrison Creek Reservoir Feasibility Study $49,500 <br />-6- <br />