My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10942
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD10942
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:13:37 AM
Creation date
11/16/2007 12:52:19 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
Colorado Water Conservation Board - 2001 Colorado Flood Documentation Report
Floodplain - Doc Type
Flood Documentation Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SEITIIIEIGHT <br /> <br />San Miguel Countv <br /> <br />activities included freeing roadway surfaces and culverts of debris and re-shaping drainage <br />ditches. Mr. Carlson estimated total costs to CDOT to be $2,800,000. Per Mr. Renfro, this <br />includes the $900,000 stated above for reconstruction retaining walls, $300,000 for debris <br />removal from the road surface, $150,000 for pipe cleaning, and the remainder for traffic control, <br />project management, slope stability, and other costs. <br /> <br />Mr. Horner indicated that the majority of the damages incurred by the County were roadway <br />related. Mudslides and rockslides, as a result of the heavy rainfall and flash flooding, filled and <br />covered drainage ditches, culverts, and roadways with mud and other related debris. As a result <br />of the slides, many County roads were inundated and impassable by motorists. <br /> <br />Figure 8.1-2 reveals all affected roadways and streams. Table 8.4-1 summarizes an estimate of <br />roadway related costs incurred by San Miguel County and CDOT due to this storm. <br /> <br />Table 8.4-1 <br /> <br />Estimated Flood Damage Expenditures <br />San Miguel County, Colorado <br /> <br />Agency/Personnel Estimated Cost <br />CDOT - State Highway 145 <br />Reconstruction of retaining walls $900,000 <br />Debris removal, pipe cleaning $450,000 <br />Traffic control and other costs $1.45 Million <br />CDOT Total $2.8 Million <br />San Miguel County <br />County Road 60M $5,604 <br />County Road 57P $6,736 <br />County Road 58P $1,617 <br />County Road 62L $85 <br />County Road 63L $147 <br />Sawpit City Streets $400 <br />Placerville City Streets $1,325 <br />San Miguel County Total $15,914 <br />Private Property $400,000 <br />TOTAL $3.2 Million <br /> <br />URS <br /> <br />T:\PROJ ECTS\6844888 _ CWCB _FLOOD_DOC _RPTS\SUB _00\6.0 _PROJ_DELlV\REPORT\FI NAL REPORT .2. D0020-MAR-021 \ 8 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.