Laserfiche WebLink
<br />Appendix G <br /> <br />SUMMARY OF LEVERAGE DOLLARS <br /> <br />Blue Book estimates <br /> <br /> Project Element <br />Field Surveys of Cross-Sections and Structures <br />Topographic Mapping <br /> Hydrology <br />Detailed Riverine Hydraulics <br /> Floodplain Delineation <br />Detailed alluvial Engineering Analyses <br /> Floodplain Delineation <br />Approximate Analyses & Delineation <br />Redelineation of Detailed Study Areas <br />Base Map Acquisition <br />Engineering and Floodplain Delineation Review <br />DFIRM Production <br />QA/QC of DFIRM Production <br />Post-Preliminary Processing <br />Printing & Shipping <br />Cash Contributions <br /> <br />Estimated Total Net Contribution <br /> <br /> Unit Cost CTP <br />Unit ($/unit) No. of Estimated <br /> Units Value <br />Linear miles $2,200 $0 <br />Linear/Square <br />miles $4,000 $0 <br />Linear miles $1,100 $0 <br />Linear miles $2,500 $0 <br />Linear miles $1,400 $0 <br />Square miles $3,600 $0 <br />Square miles $5,200 $0 <br />Linear miles $1,400 $0 <br />Linear miles $1,400 $0 <br />Panels $430 $0 <br />Panels $1,500 $0 <br />Panels $3,400 $0 <br />Panels $800 $0 <br />Panels $1,400 $0 <br />Panels $160 $0 <br />$ N/A $0 <br /> <br />II <br /> <br />$011 <br /> <br />28 <br />