Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />City of Brush <br />Opinion of Probable Construction Costs <br /> <br />Sunset Park <br /> <br />QUANTITY <br /> <br />UNIT <br /> <br />UNIT COST <br /> <br />AMOUNT <br /> <br />Alternative 3. 10-Year Event <br /> <br />18" RCP Class III <br />24" RCP Class III <br />30" RCP Class III <br />42" RCP Class III <br />5' Manhole <br />3' Type 13 Combination Inlet <br />6' Type 13 Combination Inlet <br />9' Type 13 Combination Inlet <br />Asphalt Removal <br />Asphalt Paving <br />C&G Removal <br />C&G Install <br /> <br />180 LF $40.00 $7,200.00 <br />120 LF $60.00 $7,200.00 <br />60 LF $85.00 $5,100.00 <br />1560 LF $120.00 $187,200.00 <br />9 EA. $4,000.00 $36,000.00 <br />5 EA. $2,500.00 $12,500.00 <br />8 EA. $4,700.00 $37,600.00 <br />6 EA. $6,900.00 $41,400.00 <br />1300 SY $3.00 $3,900.00 <br />1300 SY $18.00 $23,400.00 <br />150 LF $5.00 $750.00 <br />38 LF $10.00 $380.00 <br /> Total $362,630.00 <br /> 25% $90,657.50 <br /> SUBTOTAL $453,287.50 <br /> 10% $45,328.75 <br /> GRANDTOTAL $498,616.25 <br /> <br />CONTINGENCY (25%) <br /> <br />ENGINEERINGi (10%) <br />