Laserfiche WebLink
<br />FLOOD INSURANCE STUDY <br /> <br />. <br /> <br />. 1.0 INTRODUCTION <br />. <br /> <br />1.1 Purpose of Study <br /> <br />'. <br /> <br />'" <br /> <br />. <br /> <br />The purpose of this Flood Insurance Study is to investigate the <br />existence and severity of flood hazards in the unincorporated areas <br />of Larimer county, Colorado, and to aid in the administration of the <br />National Flood Insurance Act of 1968 and the Flood Disaster Protec- <br />tion Act of 1973. Initial use of this information will be to <br />convert Larimer County to the regular program of flood insurance by <br />the Federal Insurance Administration. Further use of the information <br />will be made by local and regional planners in their efforts to <br />promote sound land use and flood plain development. <br /> <br />. <br /> <br />1.2 Coordination <br /> <br />The identification of streams requiring detailed study was accomplished <br />at a meeting attended by personnel of Gingery Associates, Inc. (the <br />study contractor), the Federal Insurance Administration, and the <br />Larimer county Planning Department on April 20, 1976. After the Big <br />Thompson River flood of July 31, 1976, the study scope was increased <br />to include the Big Thompson Canyon area. <br /> <br />" <br /> <br />~ <br /> <br />The U.S. Army Corps of Engineers, Omaha District, was contacted and <br />provided flood plain data on the Big Thompson and the Cache La <br />Poudre Rivers for use in preparing the Flood Insurance Study. <br /> <br />JJ- <br /> <br />-.- <br /> <br />During the course of the work by the study contractor, flood eleva- <br />tions, flood boundaries and floodway delineations were reviewed with <br />community officials. <br /> <br />Final coordination meetings were held in Loveland and Fort Collins <br />on November 29 and 30, 1977, respectively. These meetings were <br />attended by representatives of Larimer County, the Federal Insurance <br />Administration, the study contractor, and the general public. The <br />results of these meetings have been incorporated into this report. <br /> <br />1.3 Authority and Acknowledgments <br /> <br />The source of authority for this Flood Insurance Study is the <br />National Flood Insurance Act of 1968, as amended. <br /> <br />... <br /> <br />The hydrologic and hydraulic analyses for this study were performed <br />by Gingery Associates, Inc., for the Federal Insurance Administration, <br />under Contract No. H-4017. This work, which was completed in <br />December 1977, covered all significant flooding sources affecting <br />the unincorporated areas of Larimer county. <br /> <br />41 <br /> <br />II <br /> <br />~ <br /> <br />~ <br />