Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE OF CONTENTS <br />FOUNTAIN CREEK DRAINAGE BASIN PLANNING STUDY <br />VOLUME III <br />SUPPORTING INFORMATION/TECHNICAL ADDENDUM <br /> <br /> <br />A. HYDROLOGY <br />TABLE 4.7-2 EXISTING LAND USE CN VALUES <br />TABLE 4.7-3 FUTURE LAND USE CN VALUES <br />HEC-I INPUT - lOa-YEAR FUTURE lAND USE CONDITIONS <br />HEC-I OUTPUT - IOO-YEAR FUTURE lAND USE CONDITIONS <br />HEC-I INPUT - IO-YEAR FUTURE LAND USE CONDITIONS <br />HEC-I OUTPUT - IO-YEAR FUTURE lAND USE CONDITIONS <br />HEC-I INPUT - IOO-YEAR EXISTING LAND USE CONDITIONS <br />HEC-I OUTPUT - lOa-YEAR EXISTING LAND USE CONDITIONS <br />HEC-I INPUT - la-YEAR EXISTING LAND USE CONDITIONS <br />HEC-I OUTPUT - 10-YEAR EXISTING lAND USE CONDITIONS <br />B. HYDRAULICS <br />HEC-2 INPUT AND SUMMARY OUTPUT - 10- AND IOO-YEAR FUTURE CONDITIONS <br />HEC-2 INPUT AND SUMMARY OUTPUT - 10- AND laO-YEAR EXISTING CONDITIONS <br />TYPICAL CHANNEL ROUGHNESS VALUES <br />COMPLETE HEC-2 OUTPUT - 10- AND laO-YEAR FUTURE CONDITIONS <br />(INCLUDED IN THE ORIGINAL ISSUE - VOLUME III ONLY) <br />COMPLETE HEC-2 OUTPUT - 10- AND laO-YEAR FUTURE CONDITIONS <br />(INCLUDED IN THE ORIGINAL ISSUE - VOLUME III ONLY) <br />COMPILATION OF HEC-2 CROSS-SECTION INFORMATION <br />(INCLUDED IN THE ORIGINAL ISSUE - VOLUME III ONLY) <br />BRIDGE OPENING INFORMATION <br />(INCLUDED IN THE ORIGINAL ISSUE - VOLUME III ONLY) <br />C. ALTERNATIVES ANALYSIS (EMPTY - ALL INFORMATION IS IN VOLUMES I AND II) <br />D. PRESENT VALUE ANALYSIS <br />TABLE 6.3-36 PRESENT VALUE ANALYSIS, SCENARIO 1 - 10-YEAR CAPITAL COST <br />EXPENDITURES <br />TABLE 6.3-37 PRESENT VALUE ANALYSIS, SCENARIO 2 - 20-YEAR CAPITAL COST <br />, EXPENDITURES <br />TABLE 6.3-38 PRESENT VALUE ANALYSIS, SCENARIO 3 - 20-YEAR CAPITAL COST <br />EXPENDITURES BEGINNING IN 1998 <br />TABLE 6.3-39 PRESENT VALUE ANALYSIS, SCENARIO 4 - 50-YEAR CAPITAL COST <br />EXPENDITURES <br />TABLE 6.3-40 PRESENT VALUE ANALYSIS, SCENARIO 5 - 1/2 CAPITAL COSTS FOR <br />2 YEARS CONSECUTIVELY PER REACH <br />TABLE 6.3-41 PRESENT VALUE ANALYSIS, SELECTED ALTERNATIVE ANALYSIS, <br />$1 MILLION TOTAL EXPENDITURE PER YEAR BEGINNING IN YEAR 1993 <br />TABLE 6.3-42 PRESENT VALUE ANALYSIS, SELECTED ALTERNATIVE ANALYSIS, <br />$1 MILLION TOTAL EXPENDITURE PER YEAR BEGINNING IN YEAR 1998 <br />