My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10498
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD10498
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:13:27 AM
Creation date
10/30/2007 10:22:18 AM
Metadata
Fields
Template:
Floodplain Documents
County
Fremont
Community
Florence
Stream Name
Coal Creek
Basin
Arkansas
Title
Coal Creek/Florence FIS Correspondence
Floodplain - Doc Type
Correspondence
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COAL CREEK THROUGH THE CITY OF FLORENCE <br />FREMONT COUNTY, COLORADO <br />REPORT OF WORK ACCOMPLISHED TO DATE <br /> <br />Reconnaissance <br />The U.S. Army Corps of Engineers, Albuquerque District (Corps), has obtained the existing base <br />map material and the HEC-2 hydraulic models used in the previous Flood Insurance Study. The <br />existing cross-sectional data has been transferred to the new HEC-RAS model where appropriate. <br />The reconnaissance and data search is 100.% complete. <br /> <br />Land Survevs <br />The Corps has consulted with G.R. Hall and Associates to survey a profile of the walls that <br />parallel Coal Creek through the city of Florence. The Corps also worked with the surveyor to <br />obtain spot elevations at bridge crossings. <br />The survey is 100% complete. <br /> <br />Hydrology <br />The Corps has determined the 10.0%-,2.0%-, 1.0%-, and 0.2%-chance (10-, 50':', 100-, and 500- <br />year) flood frequency discharge peaks to be included in the hydraulic model. <br />The hydrologic analysis is 100% complete. <br /> <br />Hydraulics <br />The Corps is currently extracting cross sections and modeling bridges to include in the HEC-RAS <br />hydraulic model. After the HEC-RAS model is complete, the Corps will compute the water <br />surface elevations and plot the floodplain delineation maps. <br />The hydraulic analysis is 30% complete. <br /> <br />Profile Concurrence <br />The profiles will be plotted upon completion ofthe hydraulic analysis. <br />Profile concurrence is 0% complete. <br /> <br />Base Map Material <br />The Corps has obtained the existing topographic base maps. <br />This task is 100% complete. <br /> <br />Work Map Preparation <br />The floodplain delineation work maps showing the 1.0%-chance and 0.2%-chance (lOO-year and <br />500-year) floodplains be prepared upon completion of the hydraulic analysis. <br />This task is 0% complete. <br /> <br />Report Preparation <br />The Corps is writing the report as work proceeds to document progress. <br />The report is 40% complete. <br /> <br />Coordination Activities <br />Coordinate activities are ongoing throughout the course of the study. <br /> <br />Technical Review <br />The review is ongoing throughout the technical analysis. A final technical review will be <br />performed upon completion of the study and before submission to the Colorado Water <br />Conservation Board and the Federal Emergency Management Agency, Region VIII. <br />
The URL can be used to link to this page
Your browser does not support the video tag.