My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10393
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD10393
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:13:25 AM
Creation date
10/29/2007 3:49:28 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
Engineering and Design - Design and Contruction of Levees
Date
3/31/1978
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />EM 1110-2-1913 <br /> <br />DEPAR'IMENT OF THE ARMY <br />Office of the Chief of Engineers <br />Washington, D. C. 20314 <br /> <br />DAEN-CWE-S <br /> <br />31 March 1978 <br /> <br />Engineer Manual <br />No. 1110-2-1913 <br /> <br />r <br /> <br />Engineering and Design <br />DESIGN AND CONSTRUCTION OF LEVEES <br /> <br />... <br /> <br />Table of Contents <br /> <br />Paragraph Page <br /> <br />Subject <br /> <br />INTRODUCTION <br /> <br />CHAPTER 1. <br /> <br />1-1 <br />1-2 <br />1-3 <br />1-4 <br />1-5 <br /> <br />1-1 <br />1-1 <br />1-1 <br />1-3 <br />1-3 <br /> <br />Purpose---------------------------------- <br /> <br />Applicability---------------------------- <br /> <br />References------------------------------- <br /> <br />Objective-------------------------------- <br /> <br />General Considerations------------------- <br /> <br />FIELD INVESTIGATIONS <br /> <br />CHAPTER 2. <br /> <br />. <br /> <br />2-1 <br /> <br />2-1 <br /> <br />Preliminary and Final Stages------------- <br />Section 1. Geological Study <br /> <br />Scope------------------------------------ <br /> <br />Office Study----------------------------- <br /> <br />Field Survey----------------------------- <br /> <br />Report----------------------------------- <br /> <br />Section II. Subsurface Exploration <br /> <br />General---------------------------------- <br /> <br />Phase I Exploration---------------------- <br />Phase 2 Exploration---------------------- <br /> <br />Borings---------------------------------- <br /> <br />Geophysical Exploration------------------ <br />Section III. Field Testing <br />Preliminary Strength Estimates----------- <br />Vane Shear Tests------------------------- <br />Groundwater and Pore Pressure <br />Observations--------------------------- <br />Field Pumping Tests---------------------- <br /> <br />2-1 <br />2-1 <br />2-1 <br />2-4 <br /> <br />2-4 <br />2-4 <br />2-4 <br />2-5 <br />2-6 <br /> <br />2-2 <br />2-3 <br />2-4 <br />2-5 <br /> <br />2-6 <br />2-7 <br />2-8 <br />2-9 <br />2-10 <br /> <br />2-9 <br />2-9 <br /> <br />2-11 <br />2-12 <br /> <br />2-11 <br />2-11 <br /> <br />2-13 <br />2-14 <br /> <br />'" <br /> <br />...\ <br /> <br />LABORATORY TESTING <br /> <br />CHAPTER 3. <br /> <br />.. <br /> <br />3-1 <br /> <br />3-1 <br /> <br />Genera1---------------------------------- <br /> <br />Classification and Water Content <br />Determinations------------------------- <br /> <br />3-1 <br /> <br />3-2 <br /> <br />i <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.