Laserfiche WebLink
<br /> <br /> <br />I' <br /> <br /> <br />Ben Urbonas, P .E. <br />Page 2 <br />December 21, 1994 <br />RMW36573.A1 <br /> <br />@_ Fnaineers <br />_ Pla;ners <br />~ Economists <br />_ Scientists <br /> <br />I' <br /> <br />I, <br /> <br />The development of the Alternative Evaluation Report for the Upper Box Elder <br />Creek Outfall Systems Planning Study was the result of the involvement and <br />contributions of staff at UDFCD, the City of Aurora, Arapahoe County, Adams <br />County, and a number of interested agencies and districts. We would like to express <br />our appreciation for these contributions. <br /> <br />1994 <br /> <br />December 21 <br /> <br />I, <br />I, <br /> <br />CH2M HILL <br /> <br /> <br />t::~PE' <br /> <br /> <br /> <br /> <br /> <br />~ <br /> <br /> <br />. <br /> <br />We have enjoyed the opportunity to work with you and the other members of the <br />project advisory committee during the development of the Alternative Evaluation <br />Report. We look forward to receiving information on the selected plan and starting <br />work on the Preliminary Design Report. <br /> <br />Sincerely, <br /> <br />RMW36573.Al <br /> <br />Ben Urbonas, P .E. <br />Chief, Master Planning Program <br />Urban Drainage and Flood Control District <br />2480 West 26th Avenue, Suite 156B <br />Denver, Colorado 80211 <br /> <br />I~ <br /> <br />I <br /> <br />I <br /> <br />Upper Box Elder Creek Outfall Systems Planning Study <br /> <br />Subject: <br /> <br />I', <br />I. <br /> <br /> <br />Jon H. Sorensen, P .E. <br /> <br />Mr. Urbonas: <br /> <br />Accompanying this letter is the Alternative Evaluation Report for the Upper Box <br />Elder Creek Outfall Systems Planning Study. The report provides recommendations <br />for drainageway improvements in a 75-square mile study area located in the <br />southeastern portion of the Urban Drainage and Flood Control District (UDFCD) in <br />central Arapahoe and Adams Counties, immediately upstream of the Denver <br />International Airport. <br /> <br />Dear <br /> <br />I, <br />I. <br /> <br />The report represents the culmination of the first phase of the outfall systems <br />planning study for Upper Box Elder Creek, where watershed hydrology is established <br />and alternative improvement plans are formulated and evaluated. The report <br />documents the study area description, the baseline hydrologic analysis, arid <br />stormwater problems and opportunities. The formulation, refinement, and evaluation <br />of alternative improvement plans are also descnbed. Hydrologic impacts and <br />probable capital costs of alternatives are summarized. The report concludes with a <br />description of recommended improvement plans. <br /> <br />I <br /> <br />I. <br /> <br />I <br /> <br />After staff from the City of Aurora, Arapahoe County, Adams County and UDFCD <br />select the specific alternative plan for each drainageway, based on a review of this <br />report, work will start on the Preliminary Design Report. The Preliminary Design <br />Report will descnbe the selected plan in additional detail and provide preliminary <br />design drawings depicting the improvements in plan and profile. <br /> <br />I <br /> <br />I <br /> <br />303777-0900 <br /> <br />6060 S. Willow Drive, Greenwood Village, CO 80111-5142 <br />Mailing address: P.O. Box 22508, Denver, CO 80222-0508 <br /> <br />Rocky Mountain Office <br /> <br />I <br />