Laserfiche WebLink
<br />Remove & replace the existing pedestrian crossing immediately downstream of Broadway. <br />Construct pedestrian/maintenance trail along north overbank. <br /> <br />~edestrian Trail <br />. <br /> <br />BOW /Property A, uisition or Easements <br />. 13S-foot minimum channel top width is required for the proposed channel improvements <br />. Channel improvements will require the acquisition of an additional 7S-foot minimum right-of- <br />way or drainage easement. The City of Boulder has identified a 60-foot drainage easement along <br />the north bank that will be dedicated as a part of the development of the library site. <br /> <br />. <br /> <br />Excavate north overbank to increase channel capacity. This will require the remova of <br />Rosewood Avenue located on the north bank of the creek between Broadway and the Self-Storage <br />facility. <br />No modifications to the channel invert or south overbank. <br />Modify existing drop structures to match the proposed channel geometry. <br />Revegetate, landscape and mitigate wetland damage of all disturbed areas. <br /> <br />. <br /> <br /> <br /> <br />. <br />. <br />. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />~edestrian Trail <br />. No modifications to the pedestrian trail on the south overbank. <br />. Modify existing pedestrian crossing to match the proposed channel <br /> <br />I <br /> <br />geometry. <br /> <br />Miscellaneous <br />. Coordinate development of the channel improvements with the development of the City of <br />Boulder Library site on the north bank and redevelopment of the property on the south bank. <br /> <br />Structures <br />Enlarge the Broadway Box culvert. <br />Bridge or box culvert at the proposed 9th Street crossing of Fourmile Canyon Creek. <br /> <br />B.oad Crossin <br />. <br /> <br />I <br /> <br />Channel Work <br />. Channel design capacity 3,300 cfs. Allow discharges in excess of 3,300 cfs to overtop the south <br />bank and spill to the south. See typical channel cross section Figure 8-3. <br />. Excavate south overbank to increase channel capacity. <br />. No modifications to the channel invert or north overbank. <br />. Repair failed drop structure and stabilize erosion at east end of this reach. <br />. Revegetate, landscape and mitigate wetland damage of all disturbed areas. <br />. Construct a sediment capture and wetland mitigation facility at the east end of this reach. <br /> <br />Reach 5A <br /> <br />. <br /> <br />B.OW/Property A, <br />. lOa-foot minimum channel top width required for the proposed channel improvements <br />. City of Boulder currently has a drainage right-of-way width of approximate 50 feet. <br />. Expand the channel into the existing Rosewood Avenue right-of-way located on the north bank of <br />the creek between Broadway and the Self-Storage units. <br />ROWand property acquisitions, associated with the roadway <br /> <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Miscellaneous <br />. Modify the Silver Lake Ditch crossing to match proposed channel geometry. <br />Obtain off site right-of way or easements and construct off site transportation improvements and <br />related utility relocations necessitated by the removal of Rosewood Ave. Off site roadway <br />improvements, identified by the City of Boulder, include an extension of 9th Street from Cheery <br />Street north to 10th Street, a westerly extension of Yarmouth Avenue from Broadway to the new <br />9th Street extension, relocation of Rosewood and the creation of 11th Street between the relocated <br />Rosewood Avenue and the Yarmouth Avenue extension. <br />Coordinate development of the channel improvements with the <br />Boulder Housing Authority's site located on the south bank. <br /> <br />Construct pedestrian/maintenance trail along the south overbank. <br />Construct pedestrian/maintenance access crossing structure <br />Construct a multi-use underpass at Violet Avenue. <br /> <br />~edestrian Trail <br />. <br /> <br />. <br /> <br />are discussed below <br /> <br />improvements, <br /> <br />. <br /> <br />. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />. <br /> <br />B.oad Crossing Structures <br />. Remove and replace the Violet Avenue bridge structure and incorporate a multi-use underpass <br /> <br />City of <br /> <br />the <br /> <br />of <br /> <br />development <br /> <br />. <br /> <br />I <br /> <br /> <br />uisition <br /> <br />B.OW/Pro <br />. <br /> <br />Reach 5B <br /> <br />I <br /> <br />improvements <br /> <br />top width is required for the proposed channel <br />This reach located on City of Boulder property. <br /> <br />the City of <br /> <br />the development of <br /> <br />with <br /> <br />Coordinate development of the channel improvements <br />Boulder Violet Park site located on the south bank. <br /> <br />. <br /> <br />Miscellaneous <br />. <br /> <br />and continue to allow a <br /> <br />riparian habitat <br /> <br />This mitigation approach will preserve the existing creek <br />developed and level park use of this site. <br /> <br />. <br /> <br />Work <br />Channel design capacity 3,300 cfs. Allow discharges in excess of 3,300 cfs to overtop <br />bank and spill to the south. See typical channel cross section Figure 8-3. <br />Excavate north and south overbanks to increase channel capacity. <br />No modifications to the channel invert. <br />Construct 5 grade control structures to stabilize existing head cuts. <br />Remove debris and concrete slabs from the north bank. <br />Revegetation, landscaping and wetland mitigation of disturbed areas <br /> <br />the south <br /> <br />Channel <br />. <br /> <br />I <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />I <br /> <br />I <br /> <br />. <br /> <br />8-3 <br /> <br />I <br /> <br />I <br />