My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10390
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD10390
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:13:22 AM
Creation date
10/25/2007 5:33:15 PM
Metadata
Fields
Template:
Floodplain Documents
County
Boulder
Community
Boulder
Stream Name
Fourmile Canyon
Basin
South Platte
Title
Fourmile Canyon Creek - Major Drainageway Planning - Phase A Report - Alternatives Analysis
Date
6/1/2000
Prepared For
UDFCD, Boulder
Prepared By
Love & Associates
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />5-1 <br />5-1 <br />5-1 <br /> <br />DAMAGE ANALYSIS <br />5.1. Introduction <br />5.2. Methodology <br />5.3. Descrip~ion of Results <br /> <br />5 <br /> <br />Major Drainageway Planning <br />Phase A Report <br />Fourmile Canyon Creek <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />6-1 <br />6-1 <br />6-1 <br /> <br />6-1 <br />6-1 <br />6-1 <br />6-1 <br />6-3 <br />6-3 <br />6-3 <br /> <br />ALTERNATES DEVELOPMENT <br />6.1. Introduction <br />6.2. Initial Alternates <br />6.2.1 Maintain the Existing Floodplain Configuration <br />6.2.2 A Natural Type Waterway Following the General <br />Historic Channel Alignment <br />6.2.3 Selected Structural Improvements and Channel Improvements <br />6.2.4 Detention and/or Retention Facilities <br />6.2.5 Acquisition of Flood Prone Properties <br />6.2.6 Non-Structural Methods <br />6.2.7 Other-Trans-Basin Diversion of Excess Flood Waters <br />6.3. Alternate Evaluation <br /> <br />6 <br /> <br />11 <br />11 <br />11 <br /> <br />ES-I <br /> <br />1-1 <br />1-1 <br />1-2 <br />1-2 <br />1-4 <br />1-4 <br /> <br />TABLE OF CONTENTS <br /> <br />EXECUTIVE SUMMARY <br /> <br />INTRODUCTION <br />1.1. Authorization <br />1.2. Purpose and Scope <br />1.3. Mapping and Surveys <br />1.4. Project History and Correspondence <br />1.5. Acknowledgments <br />1.6. Independent Review Panel <br /> <br />LIST OF TABLES <br />LIST OF FIGURES <br />LIST OF APPENDICES <br /> <br />1 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />7-1 <br />7-1 <br />7-7 <br />7-8 <br />7-9 <br />7-11 <br />7-13 <br /> <br />ENVIRONMENTAL ASSESSMENT AND OPPORTUNITIES <br />7.1. Introduction <br />7.2. Existing Conditions <br />7.3. Environmental Goals and Objectives <br />7.4. Channel Treatment Concepts <br />7.5. Alternates Evaluation <br />7.6. Design and Management Recommendations <br />7.7. References (Chapter 7 only) <br /> <br />7 <br /> <br />8-1 <br />8-1 <br />8-2 <br />8-8 <br />8-10 <br />8-15 <br />8-17 <br />8-17 <br />8-19 <br />8-19 <br />8-19 <br />8-20 <br />8-21 <br /> <br />ALTERNATE EVALUATION AND RECOMMENDED PLAN <br />8.1. Introduction <br />8.2. Alternate 1 and 2 General Description <br />8.3.Alternate 1 - 50 Year Channel <br />8.4. Alternate 2 - 100 Year Channel <br />8.5. Alternate 3 - Maintain Existing Floodplain Configuration <br />8.6. Alternate Cost Estimates <br />8.7. Damage Reduction with Implementation of Alternates <br />8.8. Cost Benefit Analysis <br />8.9. Intangible Benefits <br />8.10. Evaluation Factors <br />8.11. Recommended Plan <br />8.12. Additional Considerations and Recommendations <br />8.13. Future Planning and Design Considerations <br /> <br />8 <br /> <br />2-1 <br />2-1 <br />2-1 <br />2-1 <br />2-1 <br />2-2 <br />2-2 <br />2-2 <br />2-2 <br />2-2 <br /> <br />STUDY AREA DESCRIPTION <br />2.1. General <br />2.2. Fourmile Canyon Creek Channel <br />2.3. Topographic Features <br />2.4. Land Use <br />2.5. Irrigation Facilities <br />2.6. Greenways <br />2.7. Environmental <br />2.8. Historic Flooding <br />2.9. Floodplain Regulations <br />2.10. Previous Studies <br /> <br />2 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />3-1 <br />3-1 <br />3-1 <br />3-1 <br />3-1 <br />3-1 <br />3-4 <br />3-5 <br />3-6 <br /> <br />HYDROLOGIC ANALYSIS <br />3.1. General <br />3.2. Spill Flows <br />3.3. Hydrologic Analysis <br />3.3.1. Original Hydrologic Model <br />3.3.2.Corrected Hydrologic Model <br />3.3.3.Future Land Use Hydrologic Predictions <br />3.3.4.Split Flow Hydrology <br />3.3.5.500-year Hydrology <br />3.4. Results of Hydrologic Analysis <br /> <br />3 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />9-1 <br /> <br />REFERENCES <br /> <br />9 <br /> <br />4-1 <br />4-1 <br />4-2 <br />4-2 <br /> <br />HYDRAULIC ANALYSIS <br />4.1. General <br />4.2. Base Mapping <br />4.3. Hydraulic Analysis <br />4.4. Results of the Hydraulic <br /> <br />4 <br /> <br />I <br /> <br />I <br /> <br />Analysis <br /> <br />I <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.