My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10385
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD10385
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:13:20 AM
Creation date
10/25/2007 4:54:34 PM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Community
Golden, Lakewood
Stream Name
Upper Lena Gulch
Basin
South Platte
Title
Major Drainageway Planning - Upper Lena Gulch - Phase B Report
Date
3/1/1994
Prepared For
UDFCD
Prepared By
Boyle Engineering Corporation
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TABLE 9 <br /> <br />SUMMARY OF RECOMMENDED PLAN COMPONENTS <br /> <br /> Estimated <br /> Construction <br />Reach Plan ComDonent Cost 110 <br />L-13 o Install Erosion Control Check Stmctures 318,900 <br />L-12 o Install Erosion Control Check Stmctures 90,600 <br />L-1I o Install Erosion Control Check Stmctures 44,600 <br />L-I0 o Install Erosion Control Check Structures 87,000 <br />L-9 o No improvements are required. 0 <br />L-8 o Construct 10-year channel along trailer park 947,000 <br /> 10-year culvert under trailer park entrance; <br /> Purchase property for channel and relocate 2 mobile homes <br /> Re-aIiJm Mt. Vernon Road <br />L-7 o Erosion Control Check Stmctures 125,600 <br />L-6 o Construct 10-year channel from Orion Street to S. Golden Rd.; 1,283,250 <br /> Construct 10-year culverts at Orion Street, Orchard Street, and <br /> 10th Avenue; <br /> Construct 100-year culvert at S. Golden Road <br />L-5 o Construct lO-year channel downstream of S. Golden Road 153,000 <br />L-4 o No improvements are reauired. 0 <br />L-3 o Construct detention pond at Upper Denver West 2,747,750 <br />L-2 o Construct 100-year culvert at Y oumdield Street 234.050 <br />L-l o Selected toe protection. N/A <br />P-3 o Construct 100-year channel from upper study limit to the existing 311 ,200 <br /> improved channel , <br />P-l. P-2 o No improvements are reauired. 0 <br />AG o Install Erosion Control Check Stmctures: 440,500 <br /> Construct 10-Year culvert at Upper Driveway <br /> Total Improvement Cost 6,783,450 <br /> <br />* Includes 20% for Contingency and 15% for Engineering where applicable. <br /> <br />The plan components presented in this report are conceptual and at the preliminary design level. Prior to <br />implementation of the plan, final design of the improvements must be done. Some modifications to the specific <br />details of plan components are to be expected during final design. <br /> <br />35 <br /> <br />I <br />I VII. Summary <br />I <br />I <br /> This Phase B Report sets forth components of a comprehensive plan for improving drainage conditions along the <br />I Upper Lena Gulch, Apex Gulch, and Pleasant View Tributary drainageways. The plan represents a systematic <br />approach to identifying specific problem areas along the drainageways and determining feasible solutions. <br /> Economic factors as well as intangible factors were considered in selection of the specific recommended plan <br />I components. <br />Table 9 contains a summary of the recommended plan components by study reach from the upstream study limits to <br />I the outfall into Maple Grove ReseIVOir. <br />The plan components presented in this report are conceptual and at the preliminary design level. Prior to <br />I implementation of the plan, final design of the improvements must be done. Some modifications to the specific <br /> . . <br />details of plan components are to be expected during final design. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.