Laserfiche WebLink
<br />lID <br /> <br />I <br />I <br /> <br />tlnQ enQlneers <br /> <br />303/987-3443 <br />FAX 303 / 987-3908 <br /> <br />consu <br /> <br />BOLlle EnQineerinQ Corporation <br /> <br />Suite 200 <br />165 South Union <br />Lakewood, Colorado 80228 <br /> <br />I <br />I <br /> <br />1994 <br /> <br />18 <br /> <br />March <br /> <br />Mr. Ben Urbonas, P.E. <br />Chief, Master Planning Program <br />URBAN DRAINAGE AND FLOOD <br />CONTROL DISTRICT <br />2480 West 26th Avenue, Suite 156-B <br />Denver, Colorado 80211 <br /> <br />I <br />I <br /> <br />er Lena Gulch Phase B Reoort <br /> <br />Boyle Engineering Corporation is pleased to present the attached Phase B Report prepared in conjunction <br />with the major drainageway planning study for Upper Lena Gulch. This report summarizes the results of <br />preliminary design of the selected recommended alternative plan for flood control improvements along <br />Upper Lena Gulch and along the Pleasant View Tributary and Apex Gulch drainageways. <br /> <br />u <br /> <br />I <br /> <br />Specific locations and characteristics of sponsor-selected recommended plan components are shown on the <br />plan and profile sheets included at the end of this report. Also shown on the plan and profile sheets is <br />mapping of the 100-year floodplain which illustrates the portions of the study area prone to flooding as a <br />result of flows in Lena Gulch, Apex Gulch, and the Pleasant View Tributary. <br /> <br />I <br />I <br /> <br />The information contained in the report should serve to aid floodplain managers in decision-making <br />regarding implementation of future improvements and development along the drainageway. The <br />preliminary designs of plan components provide the foundation for future final facility designs. Of course, <br />due to the preliminary design level of the plan component details shown in the attached plans, changes in <br />the specific details of proposed improvements are to be expected during final design. <br /> <br />I <br />I <br /> <br />The input received from the District and the other project sponsors, Jefferson County, the City of Golden <br />and the City of Lakewood, was invaluable in completing the study, We have enjoyed working with all the <br />project sponsors on. this study and wish to extend our appreciation to you and Paul Hindman as well as <br />Jeannie Rossillon and Paula Lundquist of Jefferson County, Anne Heine of Lakewood, and Scott Lewis of <br />Golden. <br /> <br />I <br />I <br /> <br />I <br /> <br />Boyle Engineering r <br /> <br /> <br /> <br />ernard E. Poppenga, P.rl <br />Principal Engineer <br /> <br />I, <br /> <br />DN-U02-303-02/krnc <br />c:/proj ects/lenalu023 0302/fin-tms <br /> <br />I <br />I <br /> <br />I <br />I <br />