My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10379
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD10379
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:13:19 AM
Creation date
10/25/2007 3:20:28 PM
Metadata
Fields
Template:
Floodplain Documents
County
Larimer
Community
Timnath
Stream Name
Cache La Poudre
Basin
South Platte
Title
CLOMR Application for Replacement of the Harmony Road Bridge at Cache La Poudre River
Date
2/21/2007
Prepared For
Kevin Houck, CWCB
Prepared By
Anderson Consulting Engineers, Inc.
Floodplain - Doc Type
Correspondence
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />E. LEVEE/FLOODWALL <br /> <br />1. Svstem Elements <br /> <br />a. This Levee/Floodwall analysis is based on (check one): <br /> <br />D upgrading of an existing leveelfloodwall system <br />D a newly constructed levee/floodwall system <br />D reanalysis of an existing levee/f1oodwall system <br /> <br />b. Levee elements and locations are (check one): <br /> <br />D earthen embankment, dike, berm, etc. <br />D structural f100dwall <br />D Other (describe): <br /> <br />Station <br />Station <br />Station <br /> <br />to <br />to <br />to <br /> <br />c. Structural Type (check one): <br /> <br />D monolithic cast-in place reinforced concrete <br />D reinforced concrete masonry block <br />D sheet piling <br />D Other (describe): <br /> <br />d. Has this levee/f1oodwall system been certified by a Federal agency to provide protection from the base flood? <br /> <br />DYes D No <br /> <br />If Yes, by which agency? <br /> <br />e. Attach certified drawings containing the following information (indicate drawing sheet numbers): <br /> <br />1. Plan of the levee embankment and f100dwall structures. <br /> <br />Sheet Numbers: <br /> <br />2. A profile of the leveelfloodwall system showing the <br />Base Flood Elevation (BFE), levee and/or wall crest and <br />foundation, and closure locations for the total levee system. <br /> <br />Sheet Numbers: <br /> <br />3. A profile of the BFE, closure opening outlet and inlet <br />invert elevations, type and size of opening, and <br />kind of closure. <br /> <br />Sheet Numbers: <br /> <br />4. A layout detail for the embankment protection measures. <br /> <br />Sheet Numbers: <br /> <br />5. Location, layout, and size and shape of the levee <br />embankment features, foundation treatment, f100dwall <br />structure, closure structures, and pump stations. <br /> <br />Sheet Numbers: <br /> <br />2. Freeboard <br /> <br />a. The minimum freeboard provided above the BFE is: <br /> <br />Riverine <br /> <br />3.0 feet or more at the downstream end and throughout <br />3.5 feet or more at the upstream end <br />4.0 feet within 100 feet upstream of all structures and/or constrictions <br /> <br />Coastal <br /> <br />1.0 foot above the height of the one percent wave associated with the 1 %-annual-chance <br />stillwater surge elevation or maximum wave runup (whichever is greater). <br /> <br />2.0 feet above the 1%,annual-chance stillwater surge elevation <br /> <br />DYes <br />DYes <br />DYes <br /> <br />DYes <br />DYes <br /> <br />DNo <br />DNo <br />DNo <br /> <br />DNo <br />DNo <br /> <br />FEMA Form 81,89B, SEP 02 <br /> <br />Riverine Structures Form <br /> <br />MT-2 Form 3 Page 4 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.