My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10358
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD10358
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:13:14 AM
Creation date
10/25/2007 3:10:38 PM
Metadata
Fields
Template:
Floodplain Documents
County
Eagle
Stream Name
Eagle River, Colorado River
Basin
Colorado Mainstem
Title
Correspondence presenting Revised Copies of FIRMS for Incorporated Eagle County
Date
12/16/2005
Prepared For
Arn Menconi, Chairman, Eagle County Board of Commissioners
Prepared By
Kevin Long
Floodplain - Doc Type
Correspondence
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. . <br /> <br />SOMA-l <br /> <br />PRELIMINARY SUMMARY OF MAP ACTIONS <br /> <br />Community: EAGLE COUNTY * <br /> <br />Community No.: 080051 <br /> <br />LOMe <br /> <br />Case No. <br /> <br />Date <br />:Issued Project :Identifier <br /> <br />Reason Determination <br />Will Be Superseded <br /> <br />NO CASES RECORDED <br /> <br />1. Insufficient information available to make a determination. <br />2. Lowest Adjacent Grade and Lowest Finished Floor are below the proposed Base Flood Elevation. <br />3. Lowest Ground Elevation is below the proposed Base Flood Elevation. <br />4. Revised hydrologic and hydraulic analyses. <br />5. Revised topographic information. <br /> <br />4. LOMRs and LOMAs To Be Redetermined <br /> <br />The LOMCs in Category 2 above will be revalidated through a single letter that reaffirms the validity of <br />the determination in the previously issued LOMC. For LOMCs issued for multiple lots or structures <br />where the determination for one or more of the lots or structures has changed, the WMC cannot be <br />revalidated through this administrative process. We will review the data previously submitted for the <br />LOMR or LOMA requests listed below and issue a new determination for the affected properties after <br />the effective date of the revised FIRM. <br /> <br />LOMe Case No. <br /> <br />Date <br />Issued <br /> <br />Project Identifier <br /> <br />01d Pane1 New Panel <br /> <br />NO CASES RECORDED <br /> <br />12/13/05 <br /> <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.