Laserfiche WebLink
<br />.J..J.I V~.1 ~uvv <br /> <br />~~;vo rftA ~U~~~l4~~ti <br /> <br />CORPS OF ENG. PLANNING <br /> <br />I4J 005 <br /> <br /> <br />i ' <br /> <br />'- <br /> <br />. . <br /> <br />. :i <br /> <br />Cost Estimate, Cache La Poudre at Greeley, Colorado <br />Task Hours Cost <br />Hvdraulics <br />Revise HEC-2 Models 8 $ 608 <br />Develop Profiles 16 $ 1,216 <br />Revise Floodways 24 $ 1,824 <br />Prepare mapping 56 $ 4,256 <br />PreDare FIS text and TSDN 40 $ 3,040 <br />Meetings and Coordination 56 $ 4,256 <br />labor cost subtotal' $ 15,200 <br />Supervision and Review (10o/a) $ 1,520 <br />Total labor cost $ 16,720 <br />Per diem (davs) 8 $ 120 <br />Vehicle Rental (days) 8 $ 240 <br />Air fare (round trips) 4 $ 2,000 <br />Grand Total Cost $ 19,920 <br />