My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10342
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD10342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:13:08 AM
Creation date
10/23/2007 3:36:43 PM
Metadata
Fields
Template:
Floodplain Documents
County
Weld
Community
Greeley
Stream Name
Poudre River
Basin
South Platte
Title
Greeley FIS Revision - Poudre River - COE
Floodplain - Doc Type
Correspondence
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(' . <br />., - <br /> <br />5. DELIVERABLE ITEMS <br /> <br />Deliverable items will be provided to the CWCB for submittal to FEMA. A Technical <br />Support Data Notebook will be prepared for the FrS as required by the FEMA Guidelines and <br />Specifications for Study Contractors. The notebook will include the general documentation, <br />engineering analyses and FIS Report data. An FIS text revision, including flood water surface <br />profiles, will be developed that describes the methods and results of the revised hydraulic <br />analysis. Work maps showing the flood boundaries, floodway and base flood elevations will be <br />provided. The City of Greeley will provide paper and electronic copies of the final mapping. <br /> <br />6. STUDY SCHEDULE <br /> <br />The draft study will be submitted to the CWCB within 9 months from the signing of the <br />agreement. The study work will be considered complete when a final meeting is held by FEMA <br />to present the preliminary FEMA flood plain maps to the City. <br /> <br />3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.