<br />7. Are there any potiential violations of the community.s floodplain management regulations (Check appropriate category)
<br />
<br />- A potential violation or violations haslhave been identified.
<br />
<br />-.! No violations have been identified,
<br />- A~ions are being taken on the part of the community to remedy the violation(s) identified during the CA V.
<br />
<br />For each structure identified as a potential violation, attach appropria,te}loc;~rnelltiltioll'perthe guidance provided
<br />NFIPGuidance for Conducting Community Assistance Contacts and Community Assistance Visits.
<br />
<br />FEMAForm 81~.JAN 92
<br />
<br />REPLACES All P~EVIOUSEDITIONS
<br />
<br />In
<br />
<br />subparagraph 5-2d of the
<br />
<br />6, Are there any pcogrammatic issues or problems identified? (Programmatic problems may relate to the
<br />nation or region as a whole. not merely to an in<:!ividuc!1 community)
<br />, ,
<br />
<br />YES
<br />
<br />5.
<br />Report
<br />
<br />Are there any pcoblems with the Biennial
<br />information)
<br />
<br />Report data? (Attach a copy showing the uPdated Biennial
<br />
<br />YES
<br />
<br />4. Are there anf other problems in the community.s floodplain management program?
<br />
<br />Serious
<br />
<br />Minor
<br />
<br />8
<br />~I
<br />G;
<br />G)
<br />
<br />3. Are there engineering ~ other problems with the maps or Flood Insurance Study?
<br />, ,
<br />
<br />~'
<br />
<br />-
<br />
<br />Serious
<br />
<br />Minor
<br />
<br />2, Are there pcoblems with the community.s administrative and enfcH-cement procedures?
<br />
<br />Minor
<br />
<br />None
<br />
<br />e
<br />
<br />PART A: Refer to subparagraph 6-2b in the NFIP GuidanQ!
<br />appropriate response. '
<br />
<br />1. Are there problems with the community's floodplain management regulations?
<br />
<br />Serious
<br />
<br />'SECTION 1II-fINDINGS .
<br />for.Conducting,CACsandCAVsforguidance in completing Questions 14. Cirde
<br />
<br />Minor
<br />
<br />207 West. Denver Avenue
<br />Holyoke, CO 80734
<br />
<br />8:.~E of. LOCAl OFFIOAl
<br />Do~ Beckius, Bldg., Official
<br />10. A!)DRESS OF LOCAL OFFICIAL
<br />
<br />
<br />,9~J~LEP..J:j9NE,NO~" _.
<br />970/854';;'305:5
<br />
<br />_.
<br />
<br />-
<br />
<br />'-~'
<br />
<br />'"
<br />,....
<br />
<br />ATT~5=fIA.up:9FTHE
<br />-ATTENDEES
<br />
<br />VISIT CONDUcTeD BY
<br />Mark Matulik
<br />
<br />6,AGENCY
<br />
<br />Colorado ~a.~er,C~p~~rvat~on Board
<br />. - . ........
<br />
<br />SECTlON'U ':0 .", ,.'.
<br />
<br />
<br />7,
<br />4/?J97
<br />
<br />
<br />Phillips
<br />DATE OF VISIT
<br />
<br />Holyoke
<br />-
<br />5,
<br />
<br />Colorado
<br />
<br />COMMUNITY 10 NUMBER
<br />0801t1
<br />
<br />Attach any other documentation related to the visit. e.g., chronology, of contacts, cccrespor.dence.'resolution of issues, community ordinance.
<br />SECTION
<br />3.
<br />
<br />1.
<br />
<br />NAME OF COMMUNITY
<br />
<br />2.
<br />
<br />STATE
<br />
<br />4,
<br />
<br />COUNTY
<br />
<br />Section IV - This section indicates the date that the CAV is dosed. A CAV can be considered closed when all program
<br />deficiencies have been corrected and violations identified have been remedied to the maximum extent possIble,
<br />and all follow- upaction(s) have been completed. The date the CA V is dosedwi/l be completed and initialed by the
<br />FEMA regional office ONLY,
<br />
<br />Section II - NName of local Official" is the name of the designated local official with the reseonsibility, authority,
<br />and the means to implement the NFIP requirements, "Adoress. and "Telephone. Number is the address ana
<br />telephone number of the local official. Attach a list of all attendees.
<br />
<br />INSTRUCTIONS
<br />A Community Visit ReRort indicating the findings must be completed after each community visit. The report should
<br />not be completed during the meeting with the local officials or provided to the local officials to complete, The
<br />Community_ Visit Report and any otlier relevant documentation should be completed and on file in the FEMA
<br />regional office within 30 days from the date ofthe visit,
<br />
<br />Section I and Section - Part A and Part B
<br />
<br />- Self-explanatory.
<br />
<br />PAPERWORK BURDEN DlSaOSURE NOTICE
<br />Public reporting burden for this form is estimated to vary from 2 to 4 hours per response, The estimate includes the time for National Flood
<br />Insurance Program (NFIP) community officials to search existing data sources, gather the data needed. and provide information to a FEMA. or
<br />State representative who will subsequently complete the form, The information is used by FEMA to assess the effectiveness of a community's
<br />im~ementation of the NFIP and to offer assistance to the community where such a need IS identified. Send comments regarding the burden
<br />estimate or any aspect of the collection, including suggestions for reducing the burden, to: Information Collections Management, Federal
<br />Emergency. Management Agency, 500 C Street, S.w,. Washington, D.C. 20472; and to the Office of Management and Budget. Paperwork
<br />Reductio~ ~roject (3067.{)198). Washington, DC 20503
<br />
<br />'to
<br />
<br />"
<br />
<br />FEDERAL EMERGENCY MANAGEMENT AGENCY
<br />COMMUNITY VISIT REPORT
<br />
<br />I O,M,B. NO,306NJ198
<br />ExpiresNovember 30,1994
<br />
|