My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC12532
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSPC12532
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:18:41 PM
Creation date
10/21/2007 11:13:15 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10
Description
Colorado River Water Projects - Glen Canyon Dam-Lake Powell - Adaptive Management
State
CO
Basin
Colorado Mainstem
Date
2/1/1998
Author
Unknown
Title
Downstream Resource Criteria for Sediment Conservation Flows - Glen Canyon Dam - AZ - 02-01-98
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />002510 <br /> <br /> ..Restore some of the natural <br /> system dynamics along the river <br /> corridor <br /> --Help the National Park Service <br /> manage riparian habitats <br />MAXIMUM RELEASE --Within PP capacity (33,200cfs); --45,000 cfs, plus or minus 1,000 <br /> steady release, plus or minus 1,000 cfs for power. The EIS provided <br /> cfs for power for flows at least 10.000 cfs above <br /> the maximum allowable release in <br /> a minimum release year. For the <br /> MLFF alternative, that maximum <br /> release is 30,000 cfs, so the BHBF <br /> would be at least 40,000 cfs <br />DURATION/FREQUENCY Duration: 7-14 days Duration: 7-14 days <br /> Freauencv: Annually, as hydrology Freauencv: 1 in every 5 years, as <br /> provides hydrology provides <br />HYDROLOGY --When projected storage in Lake --When projected storage in Lake <br /> Powell on January 1 is less than 19 Powell on January I is less than 19 <br /> maf. If projected storage is greater maf (the intent being to minimize <br /> than 19 maf. releases are likely to releases above PP capacity) <br /> be at or more than PP capacity <br />TIMING March: --In the spring (to coincide with the <br /> May/June peak in the natural <br /> --reform backwater channels prior hydrologic cycle) or in late <br /> to humpback chub spawning summer when, due to local <br /> thunderstorms, tributaries are <br /> --more sediment likely available expected so supply large quantities <br /> from tributaries in March of sediment (especially silt and <br /> --prior to peak recreational season clay) and nutrients <br /> --however, other months to be --The exact season and duration <br /> would be detennined through <br /> considered through adaptive adaptive management and <br /> management scheduled through the Annual <br /> Operating Plan process <br />OTHER CONSIDERATIONS --Would not be scheduled in a year --Must be sufficient quantities of <br /> when there is concern for a sediment available <br /> sensitive resource, such as <br /> sediment or an endangered species --Would not be scheduled <br /> following a year in which a large <br /> population of young humpback <br /> chub is produced <br /> <br />0,4 <br />0'''' <br />
The URL can be used to link to this page
Your browser does not support the video tag.