My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC12528 (2)
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSPC12528 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:18:40 PM
Creation date
10/21/2007 11:07:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10
Description
Colorado River Water Projects - Glen Canyon Dam-Lake Powell - Adaptive Management
State
CO
Basin
Colorado Mainstem
Date
6/17/1998
Author
DOI-GCMRC - Technical Work Group
Title
Lake Powell Monitoring and Research - Five-Year Program - 06-17-98
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />002~59 <br /> <br />7 <br /> <br />Over the last year, a significant effort has been initiated by GCNRA to bring other <br /> <br />funding support to the Lake Powell program. Much of that funding supports other research to <br /> <br />better understand the full range of potential impacts of dam operations on Lake Powell <br /> <br />resources. <br /> <br />PROGRAM SUPPORT <br /> <br />The GCMRC Lake Powell program is proposed to be funded in FY2000 at $325,000. <br /> <br />As noted above, it is assumed funding levels will be maintained through the period of the five- <br /> <br />year plan from FY2000 to FY2004, and that other outside funding support will be maintained. <br /> <br />The armual costs to support research vessels, equipment, instrumentation, laboratory <br /> <br />analysis, supplies, support staff, etc. and conduct monthly and quarterly water quality <br /> <br />monitoring programs to address stated information needs is approximately $220,000 to <br /> <br />$250,000 per year. The additional $75,000 to $105,000 annual proposed funds will be <br /> <br />allocated to four areas over the next five years: science and data synthesis, conceptual <br /> <br />ecosystem modeling, aquatic ecosystem impact assessments, and fish impacts from dam <br /> <br />operations. It is anticipated that approximately $75,000 will be needed for years 2000-2003 to <br /> <br />conduct information synthesis and conceptual ecosystem modeling. <br /> <br />Over the period of the five-year plan, significant outside funding will be necessary to <br /> <br />assist the GCMRC and GCNRA in understanding the impacts of Glen Canyon Dam operations <br /> <br />on other Lake Powell resources not included in the long-term plan. To accomplish needed <br /> <br />comprehensive analysis of impacts of dam operations on all facets of the lake's physical, <br /> <br />DRAFT - June 17, 1998 <br /> <br />If)~ <br />IlrN)~ ~ ~""''''<J 0,-0'/,......."''''1.'.1/ _~I .If; <br />fj / / r / AvL ~e~"t:.~::t. ~.r/i'nJD:... <br />
The URL can be used to link to this page
Your browser does not support the video tag.