My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC12528 (2)
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSPC12528 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:18:40 PM
Creation date
10/21/2007 11:07:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10
Description
Colorado River Water Projects - Glen Canyon Dam-Lake Powell - Adaptive Management
State
CO
Basin
Colorado Mainstem
Date
6/17/1998
Author
DOI-GCMRC - Technical Work Group
Title
Lake Powell Monitoring and Research - Five-Year Program - 06-17-98
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />002454 <br /> <br />2 <br /> <br />Group accepted a proposal by the GCMRC to conduct a six-month assessment of Lake Powell <br />long-term water quality data to determine if dam operations under the ROD exhibited any <br />impact on the physical, chemical, and biological resources of Lake Powell. The Transition <br />Work Group reviewed and approved ihe GCMRC proposal to conduct the evaluation. <br />A draft of the Lake Powell impact assessment was completed and externally reviewed <br />by leading limnologists for validation. The findings were presented to the Adaptive <br />Management Work Group (AMWG) at its first meeting on September 9-10, 1997. The report <br />[mdings and limnologists' review determined that dam operations specified under the ROD did <br />produce impacts to the physical, chemical and biotic resources in Lake Powell. <br />Based upon the GCMRC's [mdings of resource impacts to Lake Powell resulting from <br />operations of Glen Canyon Dam, the AMWG requested the GCMRC to: <br />1. Continue the current GCMRC monitoring program for the period of October <br />1997 to October 1998. <br /> <br />2. Conduct additional assessments of existing data relating to Lake Powell and <br />release water quality, including analyses of chemical and biological data that <br />were not performed due to time and monetary constraints. <br /> <br />3. Review with the Technical Work Group, in January 1998, all existing <br />knowledge related to the effects of Glen Canyon Dam operations on the water <br />quality in Lake Powell and downstream releases. <br /> <br />4. Develop, with the Technical Work Group, objectives and information needs for <br />any future Lake Powell water quality monitoring and research programs. This <br />activity would occur in January to March 1998. <br /> <br />5. Develop for the Adaptive Management Work Group and Technical Work Group <br />approval, a proposed monitoring and research plan for any specified future Lake <br />Powell water quality monitoring programs. The draft plan would be produced <br />by June 1, 1998. <br /> <br />The GCMRC has in coordination with the TWG completed all of the above activities as <br />requested by the AMWG. Monitoring and research activities of the GCMRC beyond October <br />1, 1998 (FY 1999) is based on the approved FY 1999 Monitoring and Research Plan and <br />AMWG review and approval of this long-term Lake Powell Water Quality Monitoring and <br /> <br />DRAFT - June 17, 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.