My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC12520
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSPC12520
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:18:39 PM
Creation date
10/21/2007 10:39:58 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10
Description
Colorado River Water Projects - Glen Canyon Dam-Lake Powell - Adaptive Management
State
CO
Basin
Colorado Mainstem
Date
11/1/1997
Author
DOI-GCMRC
Title
The State of Natural and Cultural Resources in the Colorado River Ecosystem - Draft - 11-01-97
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />00238'7 <br /> <br />5 <br /> <br />High snowpack accumulation in the Rocky Mountains in the winter of 1996-97 <br />increased the likelihood of high flows into Lake Powell, and discharge levels from Glen <br />Canyon Dam were increased to a constant 27,000 cfs in late February and March 1997 High <br />constant flows of24,000 predominated in March and April, and was maintained at nearly <br />constant flows of20.000 to 21,000 cfs from May through August. A 3-day constant 8,000 <br />cfs flow experiment was conducted from August 30 through 1 September (Labor Day) to <br />compare sandbar size and distribution with that of previous years. <br /> <br />Final Draft - 12/12/97 - For AMWG Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.