My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC12502 (2)
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSPC12502 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:18:36 PM
Creation date
10/21/2007 8:35:56 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10
Description
Colorado River Water Projects - Glen Canyon Dam-Lake Powell - Adaptive Management
State
CO
Basin
Colorado Mainstem
Date
6/10/1998
Author
Unknown
Title
Glen Canyon Dam Management Objectives - Draft - 06-10-98
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />etOn5'ti3 <br /> <br />15 <br /> <br />B.2 - KaDab AmbersDail <br /> <br />MO 14: Sustain populations of Kanab ambersnail wherever they currently exist within the <br />Colorado River ecosystem. <br /> <br />IN 14.1 Determine specific habitat characteristics required by the KAS. (T&C 3--p.41) <br /> <br />IN 14.2 Determine special flow impacts on Kanab ambersnail to assure that the level <br />of incidental take is not exceeded. (I. T. - p.40) <br /> <br />IN 14.3 Complete a census of the population and characterize the habitat. Once <br />habitat requirements are determined, other potential habitat sites within the <br />Grand Canyon corridor will be surveyed to determine species presence and <br />recovery potential. (Conservation Recommendation 5--pA3) <br /> <br />IN 14.4 Survey KAS habitat before and after any flow greater than 25,000 cfs to <br />determine population and its species response to disturbance and ability to <br />recover. (T &C 4, pA2; and RPM) <br /> <br />IN 14.5 Determine Kanab Ambersnaillife history schedule for populations in the <br />Colorado River ecosystem. (Conservation Recommendation 5) <br /> <br />IN 14.6 Evaluate and monitor KAS populations within the Colorado River ecosystem. <br />Determine ecological characteristics susceptible to changes in dam operations, <br />i.e., population size, habitat needs, life history requirements. <br /> <br />MA 14.1 Protect the habitat necessary for the survival of the existing population of <br />Kanab ambersnail. (Incidental Take--pAO) <br /> <br />MA 14.2 Do not allow high flows, or a controlled flood, to destroy more than 10% of <br />the existing KAS occupied habitat in Grand Canyon. (Incidental Take--pAO) <br /> <br />MA 14.3 Develop agreed upon research protocol and conduct research in such a manner <br />as to minimize disturbance to the KAS population and habitat. (T &C 3--p.41) <br /> <br />MA 1404 Before another BHBF (45,000 cfs or greater), Reclamation will enter into <br />informal consultation with the U.S. Fish and Wildlife Service and Arizona <br />Game and Fish Department to: <br /> <br />MA 14Aa evaluate the test flow studies (RPM 2, 1996 BHBF); <br /> <br />Revised 6-10-98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.