Laserfiche WebLink
<br />3-11 <br /> <br />~ <br /> <br />cost of the job by up to 30 percent. An example of FULLPRINT output <br />is shown in Appendix A. The.Standard Control output options are <br />discussed in Section 3.6.9. <br /> <br />3.3.2.4 PASS option -- Generally, a pass is the processing one time <br />through a complete watershed. A pass is usually represented by the. <br />results of a particular set of conditions within a watershed such as a <br /> <br />specific rainfall over the watershed or a certain set of alternatives. <br />The pass number is incremented by one when an ENDCMP Executive Control <br />statement is encountered. <br /> <br />The default value for the initial pass number is 1 for each TR-20 job. <br />The user may change the initial pass number with the PASS option by <br />placing PASS=XXX in columns 41-48 of the JOB statement. The XXX is a <br />right justified integer. The pass number is printed in the top, right <br />corner of each page of output, except the summary pages. <br /> <br />~. <br /> <br />3.3.2.5 SUMMARY option -- The SUMMARY option field is columns 51-60 <br />of the JOB statement. By placing SUMMARY in this field the user will <br />not have to enter individual SUM options on the Standard Control <br />operations to obtain the summary tables described in Section 4.1.6. <br />, <br />All operations (except SAMOV for all alternates and storms) will be <br />included in Summary Tables 1 and 3. If the user wants to control what <br />operations are displayed this field should be left blank and the user <br />must specify the desired individual SUM options described in Section <br />3.6.9. If both the SUMMARY and all the SUM options are left blank no <br />Summary Tables 1 or 3 or Intermediate Peaks output will be provided. <br />Combined with the Noprint option and no other Standard Control options <br />on, this will result in a run with no computational results printed <br />out. <br /> <br />. <br /> <br />3.3.8 PLOT option -- The PLOT option can be used to have plots made <br />of discharge vs.. area for cross sections having, tabular data. This <br />option is controlled by control words placed into the field in columns <br />61-67 of the JOB statement. There are three options when using PLOT. <br />These are: <br />